Whole homes · 01 · The whole house, renovated as one

Whole-Home Renovations in Cambridge

Home renovations in Cambridge can take out a load-bearing wall. A beam sized for the load replaces it under a building permit, and it stays uncovered until the inspector has seen it.

Licensed builder
WSIB
Years building
15+
Houses completed
300+
The main floor of an older house opened up: a flush beam where a wall once stood, the kitchen beyond, a white oak floor and new dark-framed windows.

What’s included

What’s included
in a whole home.

Planned as one sequence, a renovation moves through the house in this order: layout, structure, services, finishes, then the outside where the job includes it.

  • The main floor of an older house opened up during a renovation, the new layout framed in fresh studs on a clean subfloor.

    Layout changes and open-concept conversions

    Across the whole floor plan, the walls to remove and the openings between rooms are fixed first. Beams and pipes are placed after that.

  • A new laminated beam on a built-up post carrying the floor above, where a load-bearing wall was taken out.

    Structural work: load-bearing walls and beams

    The beam replacing the wall is sized for its load and installed under a building permit. It stays open until inspection is signed off.

  • An interior wall opened to its studs, with the water lines, drain, wiring and a heating duct run neatly through it before drywall.

    Electrical, plumbing and HVAC, coordinated

    Booking each trade and holding the schedule is the builder’s job. It means rough-ins are inspected house-wide before a room closes.

  • An upstairs hallway after a whole-home renovation, with smooth painted walls, tall baseboards and wide-plank white oak running into the bedroom beyond.

    Insulation, drywall, flooring, trim and paint throughout

    A finished room is not reopened by the next trade, since each finish is done across the entire house in a single pass.

  • A corner of a renovated house with new linen-white siding, tall dark-framed windows, a standing-seam roof edge and a cedar soffit.

    Siding and windows, as part of the whole

    Where the outside is in the job, siding and windows are done within the same project, so the exterior is not a second one later.

How it runs

The whole frame,
stage by stage.

Five stages run in the same order on a room or a whole house, and one builder is accountable for each.

  1. 01

    Permits

    Filing the building permit for moving walls and structure comes before any wall opens.

  2. 02

    Structure

    Framing the new layout comes after walls are out and beams are in across the house.

  3. 03

    Trades

    Open walls are shared by the trades, so the builder orders them and inspections come next.

  4. 04

    Finishes

    Every room is done together: insulation and drywall first, flooring, trim and paint after.

  5. 05

    Handover

    With all rooms done, final inspection follows and the house is handed over finished.

Why Hanna Homes

Why one builder
for all of it.

What a job across the whole house depends on, and how one builder holds it together.

On one plan, layout and structure come before services and finishes, so no room is opened again for each trade that follows.

No drywall goes up until the beams, set and left open, have been inspected. That way no finish ends up over uninspected work.

Open walls hold the wiring, pipes and ducts together, so the builder fixes a booking order that the inspections can follow.

Material in the walls and ceilings the plan opens is examined first, so a finding is built into the order of rooms before the trades are booked.

Client reviews

Their house,
their words.

01Whole home

We put off the whole house for years because we couldn’t picture living through it. Akram walked us through every stage before it started, and each week went the way he said it would.

Laura M.Oakville
02Whole home

We bought an older house knowing it needed everything. Akram was straight with us from the first visit about what was worth keeping. Every room is new to us now, and it still feels like the house we fell for.

Jessica W.Kitchener
03Kitchens

The crew covered the floors and cleaned up at the end of every day, which mattered with two kids at home. The new kitchen is the room everyone ends up in now. Worth every week of takeout.

Sanjay P.Burlington
04Custom homes

Building a new house was the biggest decision we’ve ever made, and it never felt rushed. We walked the site most Saturdays and always knew exactly where things stood.

Michelle R.Ancaster
05Basement apartments

We turned the basement into a unit for my mother-in-law. She has her own entrance and her own kitchen, and we still get Sunday dinners. The paperwork I was dreading turned out to be the part I thought about least.

Daniel K.Kitchener
06Additions

We needed more room but didn’t want to leave the street. The second storey went on over the summer, and from the sidewalk you’d think the house was always built that way.

Greg H.Burlington
07Bathrooms

One bathroom is a small job for a builder, but they treated it like the whole house. The tile lines up, the door finally closes properly, and they finished the week they said they would.

Ana T.Cambridge
08Knockdown & rebuild

Our old bungalow wasn’t worth saving, so we took it down and built new on the same lot. They kept the neighbours in the loop from demolition to the final walk-through. We love coming home to it.

Priya S.Oakville
09Basements

The basement used to be storage and a furnace. Now it’s a family room the kids actually want to be in. A clear quote, no surprises, and the site was swept every night.

Kevin L.Ancaster
10Kitchens

Third builder we spoke to, and the only one who returned every call. When we changed our minds about the island halfway through, they made it work without any drama.

Robert F.Cambridge

01 / 10

Projects

Selected work,
inside and out.

Two whole homes and three rooms, each one finished: a bungalow, a new house, a kitchen, a bath and a basement.

01Whole-Home Renovations

A bungalow, renewed in limewash.

Windows run floor to ceiling, brick is limewashed, with an oak door to a limestone forecourt and cedar under the eaves.

01 / 05

Service area

Within an hour
of Burlington.

Common questions

Common questions
in Cambridge.

In Cambridge the cost turns first on how much of the plan needs a City permit: walls that open, structure that changes, plumbing or drains that move. Each brings drawings and inspections with it. After that the price follows the size of the house and the finishes chosen, so no figure is posted here. A number given before the plan exists would be a guess.

We do not promise a duration, and in Cambridge two things outside the crew set much of it. The permit has to be issued before work starts, and every City inspection happens on a date requested at least 24 hours ahead. Framing and plumbing rough-in wait open until the inspector has seen them. The size of the house and how far the layout moves do the rest.

Almost always. The City’s permit list includes interior structural alterations, adding or removing walls, and plumbing or drains, and a whole-home job nearly always has at least one of them. Hanna Homes takes the application through the City and books the inspections after it. A mature tree is a separate matter: cutting or injuring one 20 cm across or more needs its own permit.

Any wall you add or remove. Cambridge lists adding or removing walls and interior structural alterations as permit work, so the City sees drawings first, whether or not the wall carries load. Hanna Homes finds out what a wall carries before the plan is final, because a bearing wall brings a beam and an uncovered opening for the inspector.

The permit drawings, then the order of everything after: which walls open, where drains land, which trees sit near the access. In Cambridge the permit sets the sequence, and each inspection is requested once a stage is ready, so the trades are booked around those dates and not ahead of them. Hanna Homes lays that out once for the whole house.

Still have a question?

Get a free estimate

People also ask

Before you build,
people in Cambridge ask.

What people in Cambridge search before whole-home renovations, answered for the town.

  • It starts with a call about the house, and the plan is then built backward from the City's two fixed points: the permit before work and the inspection calls during it. Hanna Homes, a licensed builder based in Burlington, fits the layout, structure and trades between them and asks early whether a tree 20 cm across or more is in the way.

  • At two points: the permit, which must be issued before work starts, and each inspection, which the permit holder requests at least 24 hours ahead once a stage is ready. Framing and plumbing rough-in stay open until the inspector has seen them. Everything else moves at the crew’s pace.

  • Yes, across Cambridge. Hanna Homes is a licensed builder based in Burlington, and Galt, Preston and Hespeler are parts of the city where the work happens. The City’s permit list and inspection calls apply the same in each, so a house in any of them is planned around the same two fixed points: the permit and the inspections.

Good to know

Good to know
about whole-home renovations in Cambridge.

What changes the work in Cambridge: the rules, the houses and the ground.

Home renovation in Cambridge: permits for walls, drains and structure

Cambridge lists interior structural alterations, adding or removing walls, and plumbing or drains among the work that needs a building permit. A whole-home job nearly always involves at least one, so the drawings go to the City before any trade is booked, and the permit sets the order for everything that follows.

Inspections are requested, not scheduled for you. Once a stage is ready, the permit holder calls the inspector named on the permit at least 24 hours before the date wanted. Hanna Homes books each visit as a stage nears and closes walls only after it has happened.

Source: City of Cambridge: building permits

Whole home renovation in Cambridge, from first plan to beam

One plan covers the whole house: which walls open, where the kitchen and bathrooms sit, how the rooms connect. Where a load-bearing wall comes out, a beam takes over its load, under the City permit. Electrical, plumbing and HVAC are coordinated onto the carpentry’s schedule. The finishing then moves through every room in one pass: insulation, drywall, flooring, trim and paint. Siding and windows join the job when the outside is part of it.

Home renovation contractors in Cambridge: what sets the dates

Cost in Cambridge follows how far the plan reaches into walls, structure and drains, because those changes bring permit drawings, structural sizing and extra inspections. A job that rearranges every floor prices differently from one that opens a single wall. Hanna Homes starts with a conversation about the house and what you want it to become, not with a number.

Timing has parts the crew does not control. The permit must be issued before work starts, and each inspection waits for a date requested at least 24 hours ahead. No duration is promised here because those dates are not ours to set.

Renovating a Cambridge house with a mature tree by the access

A whole-home job needs a way in for bins, deliveries and materials, and an exterior change such as a new window opening or a wall pushed outward puts work close to whatever grows beside the house. Cambridge requires a permit to remove, cut down or injure a tree with a diameter of 20 cm (8 inches) or more. Hanna Homes looks at the trees near the access and the exterior work while the plan is on paper, so that permit is sorted out before any equipment arrives.

Source: City of Cambridge: forestry

Get a free estimate

Walk us throughthe whole house.

Send a floor plan, or a list of the rooms in the job, with the walls you would like gone marked on it.

  • Licensed builder

    Burlington, Ontario

  • 15+ years

    Building

  • 300+ houses

    Completed