Skip to content

Rooms · 08 · A second unit, made legal

Legal Basement Apartments in Burlington

Legal basement apartment in Burlington, for owners building a second unit in their own house, not for renters. The zoning and the building code both have to accept it, each at its own stage.

Years building
15+
Houses completed
300+
Rated
5★
A basement apartment with its own compact kitchen, a large egress window in a window well under a smoke alarm, and its own entrance door.

What’s included

What a second
unit takes.

What turns a finished basement into a second dwelling, one part at a time.

  • A basement apartment’s own walkout entrance at the back of a brick house: a sunken limestone patio, steps down and a glazed door under a cedar canopy.

    A separate entrance

    A door and stair of its own, placed where the zoning allows an entrance, so nobody walks through the house above.

  • A basement apartment’s own bathroom, with a tub and shower behind a glass panel and a compact vanity under a high window.

    Its own kitchen and bathroom

    Plumbing and electrical of its own, with the unit’s drains and supply lines kept separate from the floor above.

  • A solid fire-rated door with a closer between the apartment and the house, and a smoke and carbon monoxide alarm on the ceiling.

    Fire separation, smoke alarms and egress windows

    A rated separation between the two units, interconnected smoke alarms, and bedroom windows large enough to leave through.

  • A basement apartment framed, insulated and closed in overhead with fire-rated drywall, a new egress window set in the foundation wall, ready for inspection.

    Permits and inspections for a legal unit

    A building permit on a lot the zoning allows, with inspections at stages and its own electrical permit.

How it runs

One bay of it,
stage by stage.

Five stages in the same order for a room and a whole house, with one builder answering for each.

  1. 01

    Permits

    Zoning is checked first, then the building permit, because not every lot qualifies.

  2. 02

    Structure

    Framing goes up, with the walls and ceiling between the units built as fire separations.

  3. 03

    Trades

    Drains, supply lines and shut-off valves go in apart from the house above, then the unit’s wiring.

  4. 04

    Finishes

    Alarms are wired through both units, then the kitchen, bathroom and floors go in.

  5. 05

    Handover

    Nobody moves in before the final inspection closes the permit.

Why Hanna Homes

Why one builder
for all of it.

What a second unit asks of a builder, settled first.

The schedule runs toward the final inspection, because a unit cannot be occupied until it passes, and a tenant’s date comes second.

The unit gets its own fire separation, its own plumbing and its own electrical permit, as a dwelling does, instead of a kitchen added to a finished basement.

The fire separation and the interconnected smoke alarms are planned together and inspected together, so neither is an afterthought.

Only one exterior entrance is allowed on each street-facing elevation, so the separate door is placed first and the stair and grading follow it.

Client reviews

Their house,
their words.

01Basement apartments

We turned the basement into a unit for my mother-in-law. She has her own entrance and her own kitchen, and we still get Sunday dinners. The paperwork I was dreading turned out to be the part I thought about least.

Daniel K.Kitchener
02Whole home

We put off the whole house for years because we couldn’t picture living through it. Akram walked us through every stage before it started, and each week went the way he said it would.

Laura M.Oakville
03Kitchens

The crew covered the floors and cleaned up at the end of every day, which mattered with two kids at home. The new kitchen is the room everyone ends up in now. Worth every week of takeout.

Sanjay P.Burlington
04Custom homes

Building a new house was the biggest decision we’ve ever made, and it never felt rushed. We walked the site most Saturdays and always knew exactly where things stood.

Michelle R.Ancaster
05Additions

We needed more room but didn’t want to leave the street. The second storey went on over the summer, and from the sidewalk you’d think the house was always built that way.

Greg H.Burlington
06Bathrooms

One bathroom is a small job for a builder, but they treated it like the whole house. The tile lines up, the door finally closes properly, and they finished the week they said they would.

Ana T.Cambridge
07Knockdown & rebuild

Our old bungalow wasn’t worth saving, so we took it down and built new on the same lot. They kept the neighbours in the loop from demolition to the final walk-through. We love coming home to it.

Priya S.Oakville
08Basements

The basement used to be storage and a furnace. Now it’s a family room the kids actually want to be in. A clear quote, no surprises, and the site was swept every night.

Kevin L.Ancaster
09Whole home

We bought an older house knowing it needed everything. Akram was straight with us from the first visit about what was worth keeping. Every room is new to us now, and it still feels like the house we fell for.

Jessica W.Kitchener
10Kitchens

Third builder we spoke to, and the only one who returned every call. When we changed our minds about the island halfway through, they made it work without any drama.

Robert F.Cambridge

01 / 10

Projects

Selected work,
inside and out.

Two whole homes and three rooms, each one finished: a bungalow, a new house, a kitchen, a bath and a basement.

01Whole-Home Renovations

A bungalow, renewed in limewash.

Limewashed brick, cedar under the eaves, windows floor to ceiling and an oak door onto a limestone forecourt.

01 / 05

Service area

Within an hour
of Burlington.

Common questions

Common questions
about legal basement apartments.

The entrance and the separate services move it most, because a finished basement alone needs neither. A new entrance means a stair and a door opening, the unit is plumbed apart from the house with its own shut-off valves and electrical permit, and the fire separation adds framing and wiring. A low ceiling adds underpinning or rerouted ducts. No figure is given on this page, because the lot and the house decide how far each goes.

No duration is quoted, because approvals set the pace. The lot has to qualify, then comes permit review, then inspections at stages, and nobody can move in until the final inspection closes the permit. A low ceiling adds work ahead of all that.

Yes, a building permit for the second unit, and zoning comes first: the property has to qualify under Burlington’s Zoning Bylaw, which Hanna Homes checks before the application. Burlington’s pre-building approvals then run in order: the zoning clearance lets the application be filed, and the grading and drainage clearance lets the permit issue.

The property decides before the basement does. The house has to be a detached, semi-detached or townhouse dwelling on urban residential land, it cannot be on a well, a cistern or a septic system, and the zoning clearance has to accept the unit. The ceiling height and the rest are checked once the lot passes.

Yes. Hanna Homes Construction is a licensed builder, and the same licensed builder takes on the whole project, whether it is one room, a whole home or a new house.

Hanna Homes Construction is based in Burlington and builds within about an hour's drive of it, in places including Hamilton, Oakville, Ancaster, Milton, Mississauga, Cambridge and Kitchener. If your house is close to that drive but not on the list, ask.

Call Hanna Homes Construction on (519) 897-8564 and say where the house is and what you have in mind: a room, an addition, a whole-home renovation or a new house. That first call is where a project starts.

Still have a question?

Get a free estimate

People also ask

Before you build,
people also ask.

What people search before legal basement apartments, answered by the builder.

  • Burlington’s zoning sets parking for additional residential units: none for the first unit and one more space for a second or third. Parking can shape the site plan and whether a second or third unit fits on the lot.

  • Up to three besides the main home, on an urban residential parcel with a detached, semi-detached or townhouse dwelling. Only one may go in an accessory building, so the others belong in the house or an addition.

  • It may. Ontario’s second-unit guidance says a backwater valve may be needed when a second unit is added, and fitting one in the building drain can mean cutting into the slab. The drawings settle whether it applies.

Good to know

Good to know
about legal basement apartments in Burlington.

A legal basement apartment in Burlington is a second dwelling, so the lot, the entrance and the permits are settled before the kitchen is drawn.

Legal basement apartment in Burlington: what makes it legal

In Burlington a basement apartment is an additional residential unit. It needs a building permit and has to meet the Zoning Bylaw, and not every property qualifies: a house on a well, a cistern or a septic system is outside the parcels where units are permitted.

That changes how the job is scoped. We treat a second unit as a permitted renovation or addition with the zoning confirmed first, so a lot that cannot be permitted is found at the start. The basement gets one test of its own: a secondary suite needs a ceiling of at least 1.95 m, and a low one may call for underpinning or rerouted ducts before the unit qualifies.

Source: Burlington: additional residential units

Basement apartment renovation: services for a second household

A second household needs services of its own. No plumbing serving one dwelling unit may run in or under another, so the unit’s drains and supply lines are routed apart from the house above, and Ontario’s second-unit guidance adds separate water shut-off valves for the unit.

The wiring is a job of its own too. The unit needs a separate electrical permit, and because the smoke alarms are interconnected across both units, the upstairs gets electrical work as well as the basement.

Source: Ontario: add a second unit

Fire separation and alarms between the two units

The Building Code asks for a 30-minute fire separation between units, which can drop to 15 minutes when the whole house has interconnected smoke alarms. The ceiling and wall assemblies between the two are built and inspected as separations, and that changes the drywall and the framing method.

Smoke alarms in a house with a secondary suite are interconnected, wirelessly or hard wired. The alarms and the separation are planned together and inspected as one system.

Source: Ontario: add a second unit

Entrance and move-in for a second household

Burlington allows only one exterior entrance on each elevation of the house that faces a street. That decides where the separate door can go, and with it the stairwell, the door opening and the grading outside.

Move-in comes last. An inspection is required before a building is occupied, and the final inspection is what closes the permit, so a tenant or a relative moves in after sign-off and not when the kitchen is installed.

Source: Burlington: additional residential units

Get a free estimate

Planning a unitin your basement?

Tell us about the house and who the unit is for, and we start with whether the lot and the zoning allow it.

  • Licensed builder

    Burlington, Ontario

  • 15+ years

    Building

  • 300+ houses

    Completed