Skip to content

Whole homes · 01 · The whole house, renovated as one

Whole-Home Renovations in Burlington

Home renovation in Burlington that treats the house as one job. The structure goes in first and the services are inspected before any room is closed up, so no room is finished twice.

Years building
15+
Houses completed
300+
Rated
5★
The main floor of an older house opened up: a flush beam where a wall once stood, the kitchen beyond, a white oak floor and new dark-framed windows.

What’s included

What’s included
in a whole home.

The parts of the house a renovation takes in, planned as one sequence: layout first, then structure, services, finishes and, where it is in the job, the outside.

  • The main floor of an older house opened up during a renovation, the new layout framed in fresh studs on a clean subfloor.

    Layout changes and open-concept conversions

    Which walls come out and which rooms open into each other is decided for the whole floor plan first; beams and pipes follow it.

  • A new laminated beam on a built-up post carrying the floor above, where a load-bearing wall was taken out.

    Structural work: load-bearing walls and beams

    A beam sized for the wall’s load replaces it, set under a building permit and left open for inspection until it is signed off.

  • An interior wall opened to its studs, with the water lines, drain, wiring and a heating duct run neatly through it before drywall.

    Electrical, plumbing and HVAC, coordinated

    The builder books each trade and holds the schedule, so the rough-ins for the whole house are inspected before any room is closed.

  • An upstairs hallway after a whole-home renovation, with smooth painted walls, tall baseboards and wide-plank white oak running into the bedroom beyond.

    Insulation, drywall, flooring, trim and paint throughout

    Each finish runs through the whole house in one pass, so a room is not finished and then reopened for the next trade.

  • A corner of a renovated house with new linen-white siding, tall dark-framed windows, a standing-seam roof edge and a cedar soffit.

    Siding and windows, as part of the whole

    Where the outside is in the job, siding and windows are done within the same project, so the exterior is not a second one later.

How it runs

The whole frame,
stage by stage.

Five stages in the same order for a room and a whole house, with one builder answering for each.

  1. 01

    Permits

    The building permit for the walls and structure that move, filed before any wall is opened.

  2. 02

    Structure

    Walls come out and beams go in across the house, then the new layout is framed.

  3. 03

    Trades

    Rough-ins share the open walls, so the builder orders the trades and inspections follow.

  4. 04

    Finishes

    Insulation and drywall, then flooring, trim and paint, carried through every room together.

  5. 05

    Handover

    Final inspection once every room is done, then handover of the finished house.

Why Hanna Homes

Why one builder
for all of it.

What a job across the whole house depends on, and how one builder holds it together.

Layout, structure, services and finishes are sequenced on a single plan, so a room is not opened a second time for the next trade.

Beams are set and left open for inspection before any drywall goes up, so no finish goes over work that has not been inspected.

Wiring, pipes and ducts cross in the same open walls, so the builder books them in the order the inspections can follow.

Material in the walls and ceilings the plan opens is examined first, so a finding is built into the order of rooms before the trades are booked.

Client reviews

Their house,
their words.

01Whole home

We put off the whole house for years because we couldn’t picture living through it. Akram walked us through every stage before it started, and each week went the way he said it would.

Laura M.Oakville
02Whole home

We bought an older house knowing it needed everything. Akram was straight with us from the first visit about what was worth keeping. Every room is new to us now, and it still feels like the house we fell for.

Jessica W.Kitchener
03Kitchens

The crew covered the floors and cleaned up at the end of every day, which mattered with two kids at home. The new kitchen is the room everyone ends up in now. Worth every week of takeout.

Sanjay P.Burlington
04Custom homes

Building a new house was the biggest decision we’ve ever made, and it never felt rushed. We walked the site most Saturdays and always knew exactly where things stood.

Michelle R.Ancaster
05Basement apartments

We turned the basement into a unit for my mother-in-law. She has her own entrance and her own kitchen, and we still get Sunday dinners. The paperwork I was dreading turned out to be the part I thought about least.

Daniel K.Kitchener
06Additions

We needed more room but didn’t want to leave the street. The second storey went on over the summer, and from the sidewalk you’d think the house was always built that way.

Greg H.Burlington
07Bathrooms

One bathroom is a small job for a builder, but they treated it like the whole house. The tile lines up, the door finally closes properly, and they finished the week they said they would.

Ana T.Cambridge
08Knockdown & rebuild

Our old bungalow wasn’t worth saving, so we took it down and built new on the same lot. They kept the neighbours in the loop from demolition to the final walk-through. We love coming home to it.

Priya S.Oakville
09Basements

The basement used to be storage and a furnace. Now it’s a family room the kids actually want to be in. A clear quote, no surprises, and the site was swept every night.

Kevin L.Ancaster
10Kitchens

Third builder we spoke to, and the only one who returned every call. When we changed our minds about the island halfway through, they made it work without any drama.

Robert F.Cambridge

01 / 10

Projects

Selected work,
inside and out.

Two whole homes and three rooms, each one finished: a bungalow, a new house, a kitchen, a bath and a basement.

01Whole-Home Renovations

A bungalow, renewed in limewash.

Limewashed brick, cedar under the eaves, windows floor to ceiling and an oak door onto a limestone forecourt.

01 / 05

Service area

Within an hour
of Burlington.

Common questions

Common questions
about whole-home renovations.

Three things move the cost most: how many rooms are in the job, which walls move or get a beam, and how many trades overlap in the same walls. Replacing services, running finishes through every room and bringing in siding and windows each add to it.

Inspections set the schedule. A whole house has several: the approvals ahead of the permit, the beam, the plumbing and electrical rough-ins, then the final one. Each holds the next stage until it is signed off, and the number of rooms in the job decides how much work sits between them.

Yes. Ontario requires a building permit to renovate, and a whole-home job moves walls or structure, and often a plumbing fixture, which puts that change under the permit too. Electrical is separate: a building permit is not an electrical notification, and the electrical contractor files that one.

A beam sized for the load the wall carried, set under the building permit. Anything built around it, drywall and trim included, waits until the inspector has seen the beam uncovered.

Yes. Siding and windows can sit in the same project as the interior, so the outside is built once to match the new layout instead of as a separate job after the inside is done. Windows sit in walls the layout may change, so they are chosen with it, not after.

Yes. Hanna Homes Construction is a licensed builder, and the same licensed builder takes on the whole project, whether it is one room, a whole home or a new house.

Hanna Homes Construction is based in Burlington and builds within about an hour's drive of it, in places including Hamilton, Oakville, Ancaster, Milton, Mississauga, Cambridge and Kitchener. If your house is close to that drive but not on the list, ask.

Call Hanna Homes Construction on (519) 897-8564 and say where the house is and what you have in mind: a room, an addition, a whole-home renovation or a new house. That first call is where a project starts.

Still have a question?

Get a free estimate

People also ask

Before you build,
people also ask.

What people search before whole-home renovations, answered by the builder.

  • The builder does. In a whole house the electrical, plumbing and HVAC rough-ins share the same walls, so the builder sets the order they go in. The electrical contractor, not the builder, files the ESA notification and requests the electrical inspections.

  • Often they do. Removing walls changes the routes ducts can take, and the bulkheads and soffits that hide them are held to minimum ceiling heights under the building code. The duct runs are worked out with the new layout before the beams and framing go in.

  • Yes. An inspection is required before occupancy, and a final inspection closes the building permit. On a whole-house job the handover is tied to that sign-off, so the last rooms are not handed over before it.

Good to know

Good to know
about whole-home renovations in Burlington.

Home renovations in Burlington run on approvals and sequence: what the City asks for before the permit, and what an older house needs checked before walls open.

Home renovation permits in Burlington

A renovation permit in Burlington is not the first application. Interior renovations need Pre-Building Approval from the City’s Community Planning Department as well as the permit application, so that approval sits ahead of the permit on the schedule and the walls wait on both.

Once the plans are filed, the work runs on two tracks. The building permit covers the walls and structure that move, and the municipality inspects at set stages, with nothing covered until each stage is reviewed. Electrical work is notified separately and has inspections of its own. The builder keeps both tracks moving so neither one holds up a room.

Source: City of Burlington: renovations and additions

One sequence across the whole house

The floor plan is fixed before anything is roughed in. The electrical rough-in inspection happens once every circuit and box is installed, so moving a wall afterwards means reworking wiring that was already inspected. Insulation and drywall then wait for the inspections, house-wide.

One change can add a day the crew does not control. When the job upgrades, relocates or replaces the electrical service, the utility has to disconnect the power. That visit goes on the schedule early, and the house is without power for that stretch.

Source: ESA: what you need to know

Older home renovations in Burlington

In an older house the finished walls and ceilings hide what the new layout has to meet. Ontario’s asbestos regulation asks the owner to have material likely to be disturbed examined before it is, so the walls the plan opens are the ones examined.

A renovation is opened wall by wall, not all at once, so a finding in one place can reorder the rough-ins and the drywall that follow house-wide. The report comes before the trades are booked, and the order of rooms is set around it.

Source: Ontario: asbestos on construction projects regulation

Taking out a load-bearing wall

A load-bearing wall carries the weight above it, so it is the first structural decision in the job: the rough-ins are laid out around wherever the beams land. The beam stays uncovered until the structure is inspected, and drywall and trim around it wait for that sign-off.

A wall rarely carries load alone. The electrical, plumbing and HVAC that run through it belong to the trades the builder coordinates, and their work is inspected with the rest of the rough-in before the wall is closed.

Get a free estimate

Walk us throughthe whole house.

Send a floor plan, or a list of the rooms in the job, with the walls you would like gone marked on it.

  • Licensed builder

    Burlington, Ontario

  • 15+ years

    Building

  • 300+ houses

    Completed