Skip to content

Rooms · 05 · The kitchen, rebuilt

Kitchen Renovations in Burlington

Kitchen renovation in Burlington starts from where the sink, range and fridge will land. That decides the plumbing, electrical and gas, and the order the cabinets, counters and backsplash follow.

Years building
15+
Houses completed
300+
Rated
5★
A renovated kitchen with a white oak pantry wall, a quartzite counter running up the wall, a dark range and a herringbone oak floor.

What’s included

What goes into
a kitchen renovation.

The layout and the walls come first. Every piece that goes in after them is measured off the piece before.

  • A kitchen and dining room opened into one room mid-renovation, the new island marked out on the subfloor under the new beam.

    Layout changes and opening up walls

    Walls can open up and the room can take a new shape. The sink, range and fridge positions are fixed here.

  • New inset kitchen cabinetry painted muted olive, with a glass-fronted hutch and copper-brown knobs and pulls.

    Cabinetry and millwork

    Cabinets and millwork are built to the new layout rather than the old one, and the counters are templated from them.

  • A honed dark stone counter with an eased edge and a backsplash of handmade cream tiles up to a white oak shelf.

    Counters and backsplash

    The counter template is taken from the installed cabinets. The backsplash comes last, set to the finished counters.

  • A new kitchen seen low across a herringbone white oak floor, with a pair of glass pendants over the island.

    Flooring and lighting

    Flooring goes in with the finishes. Light and outlet positions are fixed at the layout stage, before the wiring is inspected.

  • A kitchen wall opened to its studs before the cabinets go in, with the sink’s plumbing, the outlets and the range’s gas line in place.

    Plumbing, electrical and gas, coordinated

    The builder schedules the three trades in one room and keeps the walls open until the plumbing and electrical inspections pass.

How it runs

One bay of it,
stage by stage.

Five stages in the same order for a room and a whole house, with one builder answering for each.

  1. 01

    Permits

    The application and drawings go in first when a wall or the sink moves.

  2. 02

    Structure

    Walls come out or move, and the layout is set before any trade arrives.

  3. 03

    Trades

    Plumbing, electrical and gas rough in behind open walls. Drywall waits for the inspections.

  4. 04

    Finishes

    Cabinets go in, the counters are templated from them, and the backsplash follows.

  5. 05

    Handover

    Final inspection where a permit applies, then the kitchen is handed over.

Why Hanna Homes

Why one builder
for all of it.

A kitchen puts three trades in one room and measures each finish off the one before, so the builder’s order of work matters.

Everything after is measured off the layout, so the walls and the positions of the sink, range and fridge are decided before demolition starts.

A range that moves takes its gas line, hood duct and circuit along, so that wall is drawn with all three first.

A template is taken from the cabinets once they are installed, and the backsplash is cut to the finished counters, so each piece fits the one before.

Where each outlet, light and appliance goes is decided on paper first, so a late idea does not mean pulling out inspected wiring.

Client reviews

Their house,
their words.

01Kitchens

The crew covered the floors and cleaned up at the end of every day, which mattered with two kids at home. The new kitchen is the room everyone ends up in now. Worth every week of takeout.

Sanjay P.Burlington
02Kitchens

Third builder we spoke to, and the only one who returned every call. When we changed our minds about the island halfway through, they made it work without any drama.

Robert F.Cambridge
03Whole home

We put off the whole house for years because we couldn’t picture living through it. Akram walked us through every stage before it started, and each week went the way he said it would.

Laura M.Oakville
04Custom homes

Building a new house was the biggest decision we’ve ever made, and it never felt rushed. We walked the site most Saturdays and always knew exactly where things stood.

Michelle R.Ancaster
05Basement apartments

We turned the basement into a unit for my mother-in-law. She has her own entrance and her own kitchen, and we still get Sunday dinners. The paperwork I was dreading turned out to be the part I thought about least.

Daniel K.Kitchener
06Additions

We needed more room but didn’t want to leave the street. The second storey went on over the summer, and from the sidewalk you’d think the house was always built that way.

Greg H.Burlington
07Bathrooms

One bathroom is a small job for a builder, but they treated it like the whole house. The tile lines up, the door finally closes properly, and they finished the week they said they would.

Ana T.Cambridge
08Knockdown & rebuild

Our old bungalow wasn’t worth saving, so we took it down and built new on the same lot. They kept the neighbours in the loop from demolition to the final walk-through. We love coming home to it.

Priya S.Oakville
09Basements

The basement used to be storage and a furnace. Now it’s a family room the kids actually want to be in. A clear quote, no surprises, and the site was swept every night.

Kevin L.Ancaster
10Whole home

We bought an older house knowing it needed everything. Akram was straight with us from the first visit about what was worth keeping. Every room is new to us now, and it still feels like the house we fell for.

Jessica W.Kitchener

01 / 10

Projects

Selected work,
inside and out.

Two whole homes and three rooms, each one finished: a bungalow, a new house, a kitchen, a bath and a basement.

01Kitchen Renovations

Kitchen and dining, one room.

Linen cabinets to the ceiling, a white oak island with a limestone top, and the table under a wide window.

01 / 05

Service area

Within an hour
of Burlington.

Common questions

Common questions
about kitchen renovations.

Counters wait on cabinets. Cabinets are built to the new layout, so it has to be final before they are made, and the counters are templated only once those cabinets are installed. The backsplash then waits for the counters. A range that moves adds a gas line and hood duct run ahead of all of it.

The cost follows how much of the layout changes. Keeping the sink and range where they are avoids rerouting plumbing and gas behind open walls; moving them adds that work, and a permit for the plumbing. Cabinetry, counter material, flooring and lighting then set the rest.

Yes, once a wall, the sink or the range moves. Burlington requires a permit for a renovation to a house, and the application goes in with drawings before demolition. New cabinets and counters, and a sink replaced with the same type in the same spot, stay off the permit list.

Later changes mean reworking wiring that has already been inspected. The rough-in inspection comes once every circuit and outlet box is installed, which is why outlet, light and appliance positions are drawn at the layout stage, before the walls are closed.

The gas line, the hood duct and the range’s own circuit all move with it, so one wall carries three trades. The electrical contractor files the ESA notification for the new circuit, and a building permit does not replace that notice. Hanna Homes sequences the gas and plumbing around those inspection dates.

Yes. Hanna Homes Construction is a licensed builder, and the same licensed builder takes on the whole project, whether it is one room, a whole home or a new house.

Hanna Homes Construction is based in Burlington and builds within about an hour's drive of it, in places including Hamilton, Oakville, Ancaster, Milton, Mississauga, Cambridge and Kitchener. If your house is close to that drive but not on the list, ask.

Call Hanna Homes Construction on (519) 897-8564 and say where the house is and what you have in mind: a room, an addition, a whole-home renovation or a new house. That first call is where a project starts.

Still have a question?

Get a free estimate

People also ask

Before you build,
people also ask.

What people search before kitchen renovations, answered by the builder.

  • A kitchen needs 2,300 mm of ceiling height over at least 75% of its floor area, with 2,100 mm clear at any point. A soffit or bulkhead can come down to 2,100 mm only over the remaining area.

  • Yes. Opening a wall to the dining room is part of the layout work, so it is settled first, before the plumbing, electrical and gas are roughed in. Where a wall comes out, drawings and an application go in before demolition.

  • A kitchen renovation suits work that stays in the kitchen. Once walls, structure or the electrical, plumbing and HVAC need changes in other rooms too, a whole-home renovation covers them as one project.

Good to know

Good to know
about kitchen renovations in Burlington.

A kitchen goes together as a chain, each piece measured off the one before it. Where that chain starts, and what a moved sink or range adds ahead of it, sets both the permit and the pace.

Kitchen renovation permits in Burlington

New cabinets and a sink swapped for the same kind in the same spot stay on Burlington’s no-permit list. A kitchen leaves that list sooner than most rooms, because the layout is the work.

The usual triggers are a wall opened to the dining room, a sink that moves, and a range that takes its gas line and hood duct to a new spot. A moved sink puts the plumbing under a building permit, and each of the others moves a wall or a rough-in, so the drawings and the application go in before demolition, not after.

Source: Burlington: do I need a permit?

How to remodel a kitchen in the right order

To remodel a kitchen in order, fix the layout first. The rough-ins go in behind open walls, then the cabinets, counters and backsplash, each measured off the last.

Outlet and light positions are drawn at the layout stage because the ESA rough-in inspection takes place once every circuit and outlet box is installed. A move after that means reworking wiring that has already been inspected.

Source: ESA: notifications and inspections

Kitchen contractor: who fits the cabinets, counters and appliances

A kitchen contractor here fits the cabinets, counters and backsplash in sequence with the flooring and lighting, so the finishes are one job rather than three separate visits. The plumbing roughed in behind the wall waits for its inspection before drywall closes it.

Appliance sizes set the cabinet openings, so the range, fridge and dishwasher are chosen before the cabinets are built. Their circuits go to a licensed electrical contractor, because only those businesses are legally authorized to do electrical work for hire in Ontario.

Source: ESA: electrical permits and inspections

Kitchen backsplash comes last, after the counters

Cabinets are built to the layout. The counters are templated once the cabinets are installed, and the backsplash is set to the finished counters, so it is the last piece to go in.

Get a free estimate

Start with thekitchen layout.

Tell us what you have now and where the sink, range and fridge should end up, and talk it through with the builder first.

  • Licensed builder

    Burlington, Ontario

  • 15+ years

    Building

  • 300+ houses

    Completed