The crew covered the floors and cleaned up at the end of every day, which mattered with two kids at home. The new kitchen is the room everyone ends up in now. Worth every week of takeout.
Rooms · 05 · The kitchen, rebuilt
Kitchen Renovations in Cambridge
Kitchen renovation in Cambridge, layout and walls included, holds the drywall back until the plumbing and electrical inspections have passed. The cabinets, counters and backsplash follow once the walls are closed.
- Licensed builder
- WSIB
- Years building
- 15+
- Houses completed
- 300+

What’s included
What goes into
a kitchen renovation.
Layout and walls are done first. After that, each piece is measured from the one that went in before it.

Layout changes and opening up walls
Walls can be opened up, and the room’s shape can change. The fridge, range and sink are given their positions here.

Cabinetry and millwork
Both the cabinets and the millwork are made to fit the new layout, not the old one. Counters are templated off them.

Counters and backsplash
Counters are templated after the cabinets are installed. Last of all, the backsplash is made to suit the finished counters.

Flooring and lighting
Where lights and outlets go is decided when the layout is set, before the wiring inspection. Flooring comes in with the finishes.

Plumbing, electrical and gas, coordinated
The builder schedules the three trades in one room and keeps the walls open until the plumbing and electrical inspections pass.
How it runs
One bay of it,
stage by stage.
Five stages run in the same order on a room or a whole house, and one builder is accountable for each.
- 01
Permits
Application and drawings come first if a wall or sink is relocated.
- 02
Structure
No trade arrives until the layout is set. Walls are removed or moved.
- 03
Trades
Walls stay open for the rough-in of gas, plumbing and electrical. Drywall follows the inspections.
- 04
Finishes
Cabinets are installed, counters are templated off them, then the backsplash.
- 05
Handover
Handover of the kitchen follows a final inspection on any job with a permit.
Why Hanna Homes
Why one builder
for all of it.
With three trades working in one room and each finish measured off the finish before it, a builder’s order of work counts.
Measurements for everything after come from the layout, so before any demolition the walls are decided, and the sink, fridge and range are placed.
Moving a range brings its circuit, hood duct and gas line along, so the wall it moves to is drawn first with all three.
The cabinets go in, then the counters are templated from them. The backsplash gets cut to match the finished counters, so that each piece fits the last.
Inspected wiring does not come out for a late idea, because the positions of outlets, lights and appliances were set on paper first.
Start with a call.
Client reviews
Their house,
their words.
Whole homes and single rooms, in the words of the people who live in them.
Third builder we spoke to, and the only one who returned every call. When we changed our minds about the island halfway through, they made it work without any drama.
We put off the whole house for years because we couldn’t picture living through it. Akram walked us through every stage before it started, and each week went the way he said it would.
Building a new house was the biggest decision we’ve ever made, and it never felt rushed. We walked the site most Saturdays and always knew exactly where things stood.
We turned the basement into a unit for my mother-in-law. She has her own entrance and her own kitchen, and we still get Sunday dinners. The paperwork I was dreading turned out to be the part I thought about least.
We needed more room but didn’t want to leave the street. The second storey went on over the summer, and from the sidewalk you’d think the house was always built that way.
One bathroom is a small job for a builder, but they treated it like the whole house. The tile lines up, the door finally closes properly, and they finished the week they said they would.
Our old bungalow wasn’t worth saving, so we took it down and built new on the same lot. They kept the neighbours in the loop from demolition to the final walk-through. We love coming home to it.
The basement used to be storage and a furnace. Now it’s a family room the kids actually want to be in. A clear quote, no surprises, and the site was swept every night.
We bought an older house knowing it needed everything. Akram was straight with us from the first visit about what was worth keeping. Every room is new to us now, and it still feels like the house we fell for.
01 / 10
Projects
Selected work,
inside and out.
Two whole homes and three rooms, each one finished: a bungalow, a new house, a kitchen, a bath and a basement.

01Kitchen Renovations
Kitchen and dining, one room.
Cabinets in linen reach the ceiling, limestone tops the white oak island, and the table has a wide window over it.
01 / 05
Gallery
From the street
to the basement.
Every service is covered, street to basement. A tap on any picture shows it whole.Each picture opens in full. Whole homes lead in street views, then come kitchens, bathrooms and basements.
Seen one
Get a free estimate
you like?
13 pictures: Whole homes · Kitchens · Bathrooms · Basements
Service area
Within an hour
of Burlington.
Towns we build in
- 01BurlingtonHaltonHome base
- 02HamiltonHamiltonby Hwy 403, 15 min, 18 km by road, approximately
- 03OakvilleHaltonby the QEW, 20 min, 24 km by road, approximately
- 04AncasterHamiltonby Hwy 403, 25 min, 28 km by road, approximately
- 05MiltonHaltonby Hwy 407, 30 min, 30 km by road, approximately
- 06MississaugaPeelby Hwy 407 and Hwy 403, 30 min, 41 km by road, approximately
- 07CambridgeWaterloo Regionby Hwy 8 and Hwy 5, 45 min, 51 km by road, approximately
- 08KitchenerWaterloo Regionby Hwy 6 and Hwy 401, 55 min, 72 km by road, approximately
And anywhere else inside the line.
Common questions
Common questions
in Cambridge.
What Cambridge homeowners ask about kitchen renovations: what it costs, how long it takes and what the city asks for.
Cambridge puts two items on a kitchen bill that the cabinet order does not. One is permit drawings, when a wall opens or the sink's drain moves. The other is the plumbing inspection, which holds the finishing trades until the inspector has been. A kitchen that keeps its walls and fixtures avoids both. The rest depends on the room, so no figure is posted here.
Hanna Homes promises no duration. What Cambridge adds is the permit, when walls or drains move, and one phone call: the permit holder must ask the inspector for each visit at least 24 hours ahead, and the plumbing stays open until it has happened. Hanna Homes makes that call as soon as the lines are run, so the cabinet and counter crews are not left waiting on a late booking.
It depends on what moves. A kitchen that opens a wall, alters structure or relocates the sink’s plumbing is on Cambridge’s permit list. Cabinets and counters replaced where they stand do not normally need a permit. The City decides, and when one is needed Hanna Homes handles the application.
Yes, walls included. A wall that comes out is permit work in Cambridge, so its role is confirmed first and any structure it carries is dealt with before the new kitchen goes in. Plumbing and gas then follow the new positions of the sink and range, which is why the layout is settled before the cabinets.
The kitchen is out of use from demolition until the last fixture is set, whether or not you move out. In Cambridge the plumbing stays open until the inspector has seen it, so the sink is off for that wait, and Hanna Homes asks for the date the day the lines are run. Plan a temporary setup for cooking and dishes, and expect no duration to be promised here.
Still have a question?
Get a free estimatePeople also ask
Before you build,
people in Cambridge ask.
What people in Cambridge search before kitchen renovations, answered for the town.
The plumbing. The sink and dishwasher lines are seen with the walls open, on a visit the permit holder requests at least 24 hours ahead, before drywall and cabinets cover them. Gas and electrical run in the same open walls, so Hanna Homes lines the trades up before it calls.
A permit, because plumbing or drains are on the City’s list, and drawings that show the new position. The pipes are then inspected open before any finish covers them. Gas follows the range wherever it lands, which is why the layout is settled before the cabinets are ordered.
Only when the plan opens a wall, alters structure or moves the sink’s plumbing: that permit has to be issued before work starts. A kitchen that replaces cabinets and counters where they stand does not normally need one, and the City decides.
Good to know
Good to know
about kitchen renovations in Cambridge.
What changes the work in Cambridge: the rules, the houses and the ground.
Kitchen renovation permits in Cambridge
Walls, structure and drains are the three things on Cambridge’s permit list that a kitchen can touch. A wall opened to the dining room, a beam where that wall carried load, or a sink or dishwasher moved to a new wall each brings a permit application. The layout is settled with the City before the trades are booked.
Once a permit is issued, the inspector is called for each stage at least 24 hours before the date wanted. Plumbing is one of the stages held open for it, so Hanna Homes sequences the cabinets to follow the inspection and not to precede it.
Kitchen remodel in Cambridge: the layout, then everything it moves
The layout comes first, with walls opened where the room should open. Cabinetry and millwork are made for the new plan, with counters and backsplash after them and flooring and lighting last. Behind them, the plumbing, electrical and gas are coordinated by the builder, so three trades meet in one room without you running between them.
Kitchen renovation in Cambridge: what a moved sink adds to price and dates
Cost follows the layout first. A kitchen that opens to the next room or moves the sink adds drawings, structure and plumbing work; one that keeps its walls and fixtures does not. Cabinetry, counters and the room’s size do the rest, and Hanna Homes talks the kitchen through with you before a number is given.
Timing leans on two outside dates in Cambridge: the permit, where one is needed, and the inspector’s visit to see the plumbing before the walls close.
Kitchen renovation contractors in Cambridge: who calls the inspector
The contractor question in Cambridge comes down to one phone call: the permit holder must request each inspection, and the plumbing stays open until it happens. Hanna Homes asks for the date the day the lines are run, at least 24 hours ahead, and keeps drywall and cabinet delivery behind it. Where the permit applies, drawings go in before that, when a wall or the sink's drain moves.
Everything after the visit is finish work: cabinets, counters, backsplash, flooring and lighting. That is why the date matters more than the order of the finishes. A late call to the inspector pushes every one of them back.
Get a free estimate
Start with thekitchen layout.
Tell us what you have now and where the sink, range and fridge should end up, and talk it through with the builder first.
Licensed builder
Burlington, Ontario
15+ years
Building
300+ houses
Completed






