Skip to content

Rooms · 05 · The kitchen, rebuilt

Kitchen Renovations in Cambridge

Kitchen renovation in Cambridge, layout and walls included, holds the drywall back until the plumbing and electrical inspections have passed. The cabinets, counters and backsplash follow once the walls are closed.

Licensed builder
WSIB
Years building
15+
Houses completed
300+
A renovated kitchen with a white oak pantry wall, a quartzite counter running up the wall, a dark range and a herringbone oak floor.

What’s included

What goes into
a kitchen renovation.

Layout and walls are done first. After that, each piece is measured from the one that went in before it.

  • A kitchen and dining room opened into one room mid-renovation, the new island marked out on the subfloor under the new beam.

    Layout changes and opening up walls

    Walls can be opened up, and the room’s shape can change. The fridge, range and sink are given their positions here.

  • New inset kitchen cabinetry painted muted olive, with a glass-fronted hutch and copper-brown knobs and pulls.

    Cabinetry and millwork

    Both the cabinets and the millwork are made to fit the new layout, not the old one. Counters are templated off them.

  • A honed dark stone counter with an eased edge and a backsplash of handmade cream tiles up to a white oak shelf.

    Counters and backsplash

    Counters are templated after the cabinets are installed. Last of all, the backsplash is made to suit the finished counters.

  • A new kitchen seen low across a herringbone white oak floor, with a pair of glass pendants over the island.

    Flooring and lighting

    Where lights and outlets go is decided when the layout is set, before the wiring inspection. Flooring comes in with the finishes.

  • A kitchen wall opened to its studs before the cabinets go in, with the sink’s plumbing, the outlets and the range’s gas line in place.

    Plumbing, electrical and gas, coordinated

    The builder schedules the three trades in one room and keeps the walls open until the plumbing and electrical inspections pass.

How it runs

One bay of it,
stage by stage.

Five stages run in the same order on a room or a whole house, and one builder is accountable for each.

  1. 01

    Permits

    Application and drawings come first if a wall or sink is relocated.

  2. 02

    Structure

    No trade arrives until the layout is set. Walls are removed or moved.

  3. 03

    Trades

    Walls stay open for the rough-in of gas, plumbing and electrical. Drywall follows the inspections.

  4. 04

    Finishes

    Cabinets are installed, counters are templated off them, then the backsplash.

  5. 05

    Handover

    Handover of the kitchen follows a final inspection on any job with a permit.

Why Hanna Homes

Why one builder
for all of it.

With three trades working in one room and each finish measured off the finish before it, a builder’s order of work counts.

Measurements for everything after come from the layout, so before any demolition the walls are decided, and the sink, fridge and range are placed.

Moving a range brings its circuit, hood duct and gas line along, so the wall it moves to is drawn first with all three.

The cabinets go in, then the counters are templated from them. The backsplash gets cut to match the finished counters, so that each piece fits the last.

Inspected wiring does not come out for a late idea, because the positions of outlets, lights and appliances were set on paper first.

Client reviews

Their house,
their words.

01Kitchens

The crew covered the floors and cleaned up at the end of every day, which mattered with two kids at home. The new kitchen is the room everyone ends up in now. Worth every week of takeout.

Sanjay P.Burlington
02Kitchens

Third builder we spoke to, and the only one who returned every call. When we changed our minds about the island halfway through, they made it work without any drama.

Robert F.Cambridge
03Whole home

We put off the whole house for years because we couldn’t picture living through it. Akram walked us through every stage before it started, and each week went the way he said it would.

Laura M.Oakville
04Custom homes

Building a new house was the biggest decision we’ve ever made, and it never felt rushed. We walked the site most Saturdays and always knew exactly where things stood.

Michelle R.Ancaster
05Basement apartments

We turned the basement into a unit for my mother-in-law. She has her own entrance and her own kitchen, and we still get Sunday dinners. The paperwork I was dreading turned out to be the part I thought about least.

Daniel K.Kitchener
06Additions

We needed more room but didn’t want to leave the street. The second storey went on over the summer, and from the sidewalk you’d think the house was always built that way.

Greg H.Burlington
07Bathrooms

One bathroom is a small job for a builder, but they treated it like the whole house. The tile lines up, the door finally closes properly, and they finished the week they said they would.

Ana T.Cambridge
08Knockdown & rebuild

Our old bungalow wasn’t worth saving, so we took it down and built new on the same lot. They kept the neighbours in the loop from demolition to the final walk-through. We love coming home to it.

Priya S.Oakville
09Basements

The basement used to be storage and a furnace. Now it’s a family room the kids actually want to be in. A clear quote, no surprises, and the site was swept every night.

Kevin L.Ancaster
10Whole home

We bought an older house knowing it needed everything. Akram was straight with us from the first visit about what was worth keeping. Every room is new to us now, and it still feels like the house we fell for.

Jessica W.Kitchener

01 / 10

Projects

Selected work,
inside and out.

Two whole homes and three rooms, each one finished: a bungalow, a new house, a kitchen, a bath and a basement.

01Kitchen Renovations

Kitchen and dining, one room.

Cabinets in linen reach the ceiling, limestone tops the white oak island, and the table has a wide window over it.

01 / 05

Service area

Within an hour
of Burlington.

Common questions

Common questions
in Cambridge.

Cambridge puts two items on a kitchen bill that the cabinet order does not. One is permit drawings, when a wall opens or the sink's drain moves. The other is the plumbing inspection, which holds the finishing trades until the inspector has been. A kitchen that keeps its walls and fixtures avoids both. The rest depends on the room, so no figure is posted here.

Hanna Homes promises no duration. What Cambridge adds is the permit, when walls or drains move, and one phone call: the permit holder must ask the inspector for each visit at least 24 hours ahead, and the plumbing stays open until it has happened. Hanna Homes makes that call as soon as the lines are run, so the cabinet and counter crews are not left waiting on a late booking.

It depends on what moves. A kitchen that opens a wall, alters structure or relocates the sink’s plumbing is on Cambridge’s permit list. Cabinets and counters replaced where they stand do not normally need a permit. The City decides, and when one is needed Hanna Homes handles the application.

Yes, walls included. A wall that comes out is permit work in Cambridge, so its role is confirmed first and any structure it carries is dealt with before the new kitchen goes in. Plumbing and gas then follow the new positions of the sink and range, which is why the layout is settled before the cabinets.

The kitchen is out of use from demolition until the last fixture is set, whether or not you move out. In Cambridge the plumbing stays open until the inspector has seen it, so the sink is off for that wait, and Hanna Homes asks for the date the day the lines are run. Plan a temporary setup for cooking and dishes, and expect no duration to be promised here.

Still have a question?

Get a free estimate

People also ask

Before you build,
people in Cambridge ask.

What people in Cambridge search before kitchen renovations, answered for the town.

  • The plumbing. The sink and dishwasher lines are seen with the walls open, on a visit the permit holder requests at least 24 hours ahead, before drywall and cabinets cover them. Gas and electrical run in the same open walls, so Hanna Homes lines the trades up before it calls.

  • A permit, because plumbing or drains are on the City’s list, and drawings that show the new position. The pipes are then inspected open before any finish covers them. Gas follows the range wherever it lands, which is why the layout is settled before the cabinets are ordered.

  • Only when the plan opens a wall, alters structure or moves the sink’s plumbing: that permit has to be issued before work starts. A kitchen that replaces cabinets and counters where they stand does not normally need one, and the City decides.

Good to know

Good to know
about kitchen renovations in Cambridge.

What changes the work in Cambridge: the rules, the houses and the ground.

Kitchen renovation permits in Cambridge

Walls, structure and drains are the three things on Cambridge’s permit list that a kitchen can touch. A wall opened to the dining room, a beam where that wall carried load, or a sink or dishwasher moved to a new wall each brings a permit application. The layout is settled with the City before the trades are booked.

Once a permit is issued, the inspector is called for each stage at least 24 hours before the date wanted. Plumbing is one of the stages held open for it, so Hanna Homes sequences the cabinets to follow the inspection and not to precede it.

Source: City of Cambridge: building permits

Kitchen remodel in Cambridge: the layout, then everything it moves

The layout comes first, with walls opened where the room should open. Cabinetry and millwork are made for the new plan, with counters and backsplash after them and flooring and lighting last. Behind them, the plumbing, electrical and gas are coordinated by the builder, so three trades meet in one room without you running between them.

Kitchen renovation in Cambridge: what a moved sink adds to price and dates

Cost follows the layout first. A kitchen that opens to the next room or moves the sink adds drawings, structure and plumbing work; one that keeps its walls and fixtures does not. Cabinetry, counters and the room’s size do the rest, and Hanna Homes talks the kitchen through with you before a number is given.

Timing leans on two outside dates in Cambridge: the permit, where one is needed, and the inspector’s visit to see the plumbing before the walls close.

Kitchen renovation contractors in Cambridge: who calls the inspector

The contractor question in Cambridge comes down to one phone call: the permit holder must request each inspection, and the plumbing stays open until it happens. Hanna Homes asks for the date the day the lines are run, at least 24 hours ahead, and keeps drywall and cabinet delivery behind it. Where the permit applies, drawings go in before that, when a wall or the sink's drain moves.

Everything after the visit is finish work: cabinets, counters, backsplash, flooring and lighting. That is why the date matters more than the order of the finishes. A late call to the inspector pushes every one of them back.

Get a free estimate

Start with thekitchen layout.

Tell us what you have now and where the sink, range and fridge should end up, and talk it through with the builder first.

  • Licensed builder

    Burlington, Ontario

  • 15+ years

    Building

  • 300+ houses

    Completed