Skip to content

Rooms · 06 · Bathrooms, fully renovated

Bathroom Renovations in Hamilton

Bathroom renovations in Hamilton cover powder rooms, main baths and ensuites. Drain and vent lines go in and are tested for leaks before the shower floor is given its fall to the drain.

Licensed builder
WSIB
Years building
15+
Houses completed
300+
A renovated ensuite with a freestanding tub under a window, a curbless tiled shower behind glass and a dark floating vanity.

What’s included

What a bathroom
renovation includes.

The surfaces are what you see. Plumbing, ventilation and waterproofing behind them fall inside the renovation too.

  • A tub and shower tiled to the ceiling in small handmade olive tiles, with a tiled niche and an exposed copper-brown shower set.

    Showers, tubs and tile

    In ensuites and main baths the work is showers and tubs, with the tile finishing at the fixtures. A walk-in shower can replace a tub.

  • A walk-in shower covered in one continuous waterproofing membrane before tile, with its bench, drain and a new exhaust fan above.

    Waterproofing and ventilation

    Waterproofing goes onto the surround of the shower or tub ahead of any tile. Ventilation is a fan, planned in ahead of the tile.

  • A freestanding washstand with a honed white marble top, a wall-mounted copper-brown faucet, an arched mirror and two small sconces.

    Vanities and fixtures

    The vanity and fixtures go in after the tile, set to the plumbing plan so drains and valves are already where they need to be.

  • A bathroom wall opened to its studs, with the shower valve, the vanity’s plumbing, the sconce boxes and the fan duct in place.

    Plumbing and electrical, coordinated

    The plumbing and electrical are scheduled by the builder. Walls stay open until the drains have been tested.

How it runs

One bay of it,
stage by stage.

Rooms and whole houses share five stages in an identical order, and one builder answers for each.

  1. 01

    Permits

    Any permit application rests on drawings of the valve and drain positions and where a tub or shower sits.

  2. 02

    Structure

    The existing fixtures and finishes are removed, and the new layout and ceiling height are set.

  3. 03

    Trades

    The drain and vent pipes get a rough-in and a leak test. The shower floor is also given a fall to the drain.

  4. 04

    Finishes

    Waterproofing and fan go in first. Tile, vanity and fixtures follow.

  5. 05

    Handover

    Handing the bathroom back for use comes after the fan, drains and fixtures are run.

Why Hanna Homes

Why one builder
for all of it.

The room is small and wet. That makes how the hidden work is ordered count for more than the room’s size.

Fixtures wait and pipes stay uncovered until the drains and vents have been tested, so any leak turns up within easy reach.

The shower and tub areas are waterproofed before any tile goes on, because the tile covers them once it is up.

Ceiling height has to hold where a person stands, shower and tub included, so a bulkhead is checked against it before it is drawn.

With the wall open, the valve and drain for the shower go in. The tile layout is planned to fit them, so nothing is cut around them later.

Client reviews

Their house,
their words.

01Bathrooms

One bathroom is a small job for a builder, but they treated it like the whole house. The tile lines up, the door finally closes properly, and they finished the week they said they would.

Ana T.Cambridge
02Whole home

We put off the whole house for years because we couldn’t picture living through it. Akram walked us through every stage before it started, and each week went the way he said it would.

Laura M.Oakville
03Kitchens

The crew covered the floors and cleaned up at the end of every day, which mattered with two kids at home. The new kitchen is the room everyone ends up in now. Worth every week of takeout.

Sanjay P.Burlington
04Custom homes

Building a new house was the biggest decision we’ve ever made, and it never felt rushed. We walked the site most Saturdays and always knew exactly where things stood.

Michelle R.Ancaster
05Basement apartments

We turned the basement into a unit for my mother-in-law. She has her own entrance and her own kitchen, and we still get Sunday dinners. The paperwork I was dreading turned out to be the part I thought about least.

Daniel K.Kitchener
06Additions

We needed more room but didn’t want to leave the street. The second storey went on over the summer, and from the sidewalk you’d think the house was always built that way.

Greg H.Burlington
07Knockdown & rebuild

Our old bungalow wasn’t worth saving, so we took it down and built new on the same lot. They kept the neighbours in the loop from demolition to the final walk-through. We love coming home to it.

Priya S.Oakville
08Basements

The basement used to be storage and a furnace. Now it’s a family room the kids actually want to be in. A clear quote, no surprises, and the site was swept every night.

Kevin L.Ancaster
09Whole home

We bought an older house knowing it needed everything. Akram was straight with us from the first visit about what was worth keeping. Every room is new to us now, and it still feels like the house we fell for.

Jessica W.Kitchener
10Kitchens

Third builder we spoke to, and the only one who returned every call. When we changed our minds about the island halfway through, they made it work without any drama.

Robert F.Cambridge

01 / 10

Projects

Selected work,
inside and out.

The two whole homes are a bungalow and a new house, the three rooms a basement, a kitchen and a bath, each one complete.

01Bathroom Renovations

A primary bath in honed limestone.

A single glass panel closes the shower, with a stone tub below the window, lime-plastered walls and a trough vanity shaped from one block.

01 / 05

Service area

Within an hour
of Burlington.

Common questions

Common questions
in Hamilton.

Where the drains sit moves the price most. A fixture replaced in the same location needs no permit in Hamilton, while relocating plumbing does, so a swap and a rearranged room are different jobs. Shower and tub work, then tile, come after that. A price follows once the drain plan is fixed.

If the drains stay put, there is no permit step to wait for. If the toilet, shower or vanity moves, a permit and an inspection are added. Either way the order is fixed: waterproofing precedes tile, and tile precedes the vanity and fixtures. No duration is quoted before the scope is known.

Not for a like-for-like swap. A toilet, vanity or tub replaced in its existing spot, with new flooring and minor millwork, is on the City's list of projects needing no building permit. Relocating plumbing, or adding or removing a wall, does need one, and Hanna Homes handles that application and the inspection.

Behind the tile, the walls around the shower or tub get a waterproofing layer built as one system, and a fan is fitted to move steam outside. Both are installed first because neither is reachable once the tile is on.

All three. The ensuite is the compact one, centred on a shower; the main bath serves the whole household and often holds the tub; the powder room is just a toilet and a sink. Hanna Homes renovates each in full, with the plumbing and electrical coordinated.

Still have a question?

Get a free estimate

People also ask

Before you build,
people in Hamilton ask.

What people in Hamilton search before bathroom renovations, answered for the town.

  • Ask who waterproofs the surround, who coordinates the plumber and electrician, and who handles the paperwork if a drain moves. Hanna Homes, a licensed builder in Burlington, takes all three on.

  • The one that keeps the toilet, shower and vanity on their existing drains. That avoids new plumbing and, in Hamilton, a permit. Moving them is possible, with the permit and inspection added.

  • A fan to move the steam out, and lighting wired with the room's electrical. The builder coordinates both, and they go in ahead of the drywall.

Good to know

Good to know
about bathroom renovations in Hamilton.

What changes the work in Hamilton: the rules, the houses and the ground.

Bathroom renovation permits in Hamilton

A fixture swapped in place is exempt from a Hamilton building permit, as are minor millwork, cabinetry and flooring. A bathroom brought up to date on its existing layout can be scoped without one. A new layout does need one. The City counts new or relocated plumbing as permit work, and adding or removing walls too, so a moved shower, toilet or laundry drain adds a permit and an inspection to the schedule. The plumbing plan is therefore fixed early, before any tile is chosen.

Source: City of Hamilton: building permits

Bathroom remodeling in Hamilton: what the job includes

A bathroom remodel covers the shower or tub and the tile laid to the fixtures, the waterproofing and ventilation behind them, and the vanity and fixtures. The plumbing and electrical are coordinated by the builder as part of the job. Hamilton is 15 minutes from Hanna Homes' base in Burlington. The licensed builder runs the same five stages as for a whole house, from permit to handover, and answers for each one.

Bathroom remodel in Hamilton: cost and timing

Price moves with whether fixtures and drains stay where they are, how much shower or tub work the room needs, and the tile chosen. In Hamilton the first of those decides whether a permit is part of the job. Time follows the stages. Old fixtures and finishes come out, plumbing and electrical are run before the walls close, then waterproofing, tile, vanity and fixtures go in. Where a permit applies, the inspection comes before the room is closed up.

Tub and shower renovations in Hamilton

Tub and shower work sets the plan of the room, because the drain position decides what else can move. A tub or shower that stays on its existing drain is a different job from one that relocates, and in Hamilton the relocation is the one that needs a permit. Either way, waterproofing goes behind the tile first, so water that slips past the grout is still carried to the drain, and the fan keeps steam from soaking the drywall and framing.

Get a free estimate

Tell us what staysand what moves.

Describe the bathroom you have and the one you want, and go through the drains and shower with the builder.

  • Licensed builder

    Burlington, Ontario

  • 15+ years

    Building

  • 300+ houses

    Completed