Skip to content

Whole homes · 02 · A new house on your lot

Custom Home Builder in Hamilton

Custom home builder in Hamilton for a new house on a lot you own. The municipality inspects each stage before the next one covers it, and the final inspection is signed off before the keys change hands.

Licensed builder
WSIB
Years building
15+
Houses completed
300+
A new two-storey house with a dark standing-seam roof, pale stucco over a limestone base and a timber entry porch.

What’s included

What’s included
in a new house.

Nothing is covered until its stage has been inspected, so walls close on work that has passed.

  • A cleared building lot laid out to the plans, with batter boards and string lines marking the corners of the new house.

    Plans and permits, coordinated with your designer

    Work waits for the permit. The designer draws, and the application is coordinated by the builder with both the municipality and the designer.

  • A corner of a new house under construction, from the poured foundation and wall framing to the sheathed roof.

    Foundation, framing and roof

    The foundation goes in, then the frame and the roof, until the house is closed in and the trades can work inside it.

  • A room in a new house before drywall, with the ductwork, water lines, wiring and gas line run neatly through the framing.

    Electrical, plumbing and HVAC, coordinated

    The builder sets the sequence for electrical, plumbing and HVAC inside a closed-in house. Rough-in gets inspected first, and drywall goes over it after.

  • A corner of a new great room with a tall corner window, a white oak window seat and plaster walls, and the cedar and limestone outside.

    Interior and exterior finishes

    The builder who put up the frame also does the finishes: drywall, insulation, flooring, trim and paint inside, siding and windows outside.

  • The front hall of a new house on handover day, a set of keys on the console by the open front door.

    Final inspections and handover

    Handover follows the final inspection, the last of the municipality’s inspections at set stages during the build.

How it runs

The whole frame,
stage by stage.

Whole houses and rooms alike follow the same order: five stages, each answered for by one builder.

  1. 01

    Permits

    Your designer’s plans and the building permit, in hand before the foundation is dug.

  2. 02

    Structure

    Foundation, frame and roof come in turn, and the house is enclosed at the end.

  3. 03

    Trades

    Electrical, plumbing and HVAC booked against each other and inspected before the walls close.

  4. 04

    Finishes

    Framing the house and finishing it, inside and out, fall to one builder.

  5. 05

    Handover

    Final inspection signed off, then the keys change hands.

Why Hanna Homes

Why one builder
for all of it.

A new house starts with approvals and the ground, and the roof is on before anything goes inside.

Changes to the drawings go back to the designer who drew them, and the builder works from your designer’s plans to see what gets built first.

Under the lot, sanitary and storm lines are kept apart. Their layout is decided ahead of the foundation being formed, not fitted around the walls.

The house is framed and roofed first, so the wiring, pipes and ducts are roughed in under a roof and in a fixed order.

The lot is checked early for how much can be built on, how it drains and whether it is regulated, so the plans need no redrawing to meet an approval.

Client reviews

Their house,
their words.

01Custom homes

Building a new house was the biggest decision we’ve ever made, and it never felt rushed. We walked the site most Saturdays and always knew exactly where things stood.

Michelle R.Ancaster
02Whole home

We put off the whole house for years because we couldn’t picture living through it. Akram walked us through every stage before it started, and each week went the way he said it would.

Laura M.Oakville
03Kitchens

The crew covered the floors and cleaned up at the end of every day, which mattered with two kids at home. The new kitchen is the room everyone ends up in now. Worth every week of takeout.

Sanjay P.Burlington
04Basement apartments

We turned the basement into a unit for my mother-in-law. She has her own entrance and her own kitchen, and we still get Sunday dinners. The paperwork I was dreading turned out to be the part I thought about least.

Daniel K.Kitchener
05Additions

We needed more room but didn’t want to leave the street. The second storey went on over the summer, and from the sidewalk you’d think the house was always built that way.

Greg H.Burlington
06Bathrooms

One bathroom is a small job for a builder, but they treated it like the whole house. The tile lines up, the door finally closes properly, and they finished the week they said they would.

Ana T.Cambridge
07Knockdown & rebuild

Our old bungalow wasn’t worth saving, so we took it down and built new on the same lot. They kept the neighbours in the loop from demolition to the final walk-through. We love coming home to it.

Priya S.Oakville
08Basements

The basement used to be storage and a furnace. Now it’s a family room the kids actually want to be in. A clear quote, no surprises, and the site was swept every night.

Kevin L.Ancaster
09Whole home

We bought an older house knowing it needed everything. Akram was straight with us from the first visit about what was worth keeping. Every room is new to us now, and it still feels like the house we fell for.

Jessica W.Kitchener
10Kitchens

Third builder we spoke to, and the only one who returned every call. When we changed our minds about the island halfway through, they made it work without any drama.

Robert F.Cambridge

01 / 10

Projects

Selected work,
inside and out.

The two whole homes are a bungalow and a new house, the three rooms a basement, a kitchen and a bath, each one complete.

01Custom Homes

A dark gable, glazed two storeys high.

Limestone makes the base and forecourt, and the porch is cedar. Board and batten is deep green-black, and the roof is standing seam.

01 / 05

Service area

Within an hour
of Burlington.

Common questions

Common questions
in Hamilton.

No per-square-foot figure is given here, because the price follows the house drawn and not the footprint alone. Hamilton lots add their own lines before any framing: a lot in Pleasant View needs a Niagara Escarpment Commission permit unless it is exempt, and a Heritage Conservation District adds a heritage review. Size, the lot, the finishes and the approvals are what move the price.

Approvals are the part that varies. A lot under Hamilton Conservation Authority regulation needs that permit as a separate application, an escarpment lot may need the Commission's permit as well, and a designated or district property needs a Heritage Permit. A duration is set once the approvals a lot needs are known. The build then runs foundation, framing and roof, trades, finishes and the final inspection.

A City building permit, which needs the project to comply with the property's zoning by-law. Depending on the lot, add a Niagara Escarpment Commission Development Permit, a Hamilton Conservation Authority permit, or a Heritage Permit inside a district. Hanna Homes handles the applications alongside your designer, so the drawings and the paperwork move together.

Usually the answer comes from four checks made before design: the zoning limits on size and setbacks, whether the lot falls in the Niagara Escarpment's Area of Development Control, whether the Conservation Authority regulates it, and whether it sits inside a Heritage Conservation District. Hanna Homes builds on the lot you own, once those are known.

Bring your designer's plans and Hanna Homes builds from them. The builder works the permit through with the designer and the City, which matters here because the drawings have to show compliance with zoning before anything is issued.

Still have a question?

Get a free estimate

People also ask

Before you build,
people in Hamilton ask.

What people in Hamilton search before custom homes, answered for the town.

  • Ask who files the permits and who answers for the trades. Then ask whether the builder raises escarpment, conservation and heritage status before anything is drawn, since each can add an approval.

  • The builder takes a new house from plans and permits through foundation, framing and roof, the coordinated trades and the finishes, to the final inspection and handover. Hanna Homes is licensed and based in Burlington, about 15 minutes away.

  • A ready house skips the approvals; a custom build gives you the plan and the lot you choose. In Hamilton the deciding question is often the lot: escarpment, conservation or heritage status can lengthen the approvals before building starts.

Good to know

Good to know
about custom home builders in Hamilton.

What changes the work in Hamilton: the rules, the houses and the ground.

Custom home builder permits in Hamilton

A new house in Hamilton gets its building permit only when it fits the lot's zoning. The by-law sets size, setback and location limits, and a design over them waits for a variance. Hanna Homes puts the application together with your designer, then books the inspections as the house reaches each stage. The City's permit is only the first approval, since the lot itself can bring other agencies in, as the next sections explain.

Source: City of Hamilton: building permits

Custom homes in Hamilton: building on your lot

A new house on your own lot starts with what the lot is subject to. In the Pleasant View area, every new development needs a Development Permit from the Niagara Escarpment Commission unless it is exempt. The Commission's control area was amended to include the Pleasant View Survey lands, so other escarpment lots could need one too. A Hamilton Conservation Authority permit is a separate application. It does not exempt a project from other agencies' approvals, the Commission's included, so each one is planned alongside the City permit. The lot's status is read first, so the schedule can be set around the longest approval.

Source: Niagara Escarpment Commission: development control

Custom home cost and timing in Hamilton

The cost of a custom home moves with the size of the house, the lot it stands on, the finishes and the approvals the lot needs. In Hamilton the lot and the approvals are the part buyers tend to miss, since an escarpment, conservation or heritage lot carries extra applications that a flat site does not. The build itself runs in order: the foundation, the framing and roof until the house is closed in, then electrical, plumbing and HVAC, then the interior and exterior finishes. The municipality inspects at set stages, and the final inspection is what handover waits on.

Heritage district review in Hamilton

Inside a Heritage Conservation District, Hamilton requires a Heritage Permit for exterior alterations, construction and demolition. A new house there is exterior construction in full, so its design goes through heritage review before building starts and is shaped to the district plan. That review is separate from the building permit and is decided by the City. Knowing the lot's heritage status at the start lets that application run while your designer is still drawing.

Source: City of Hamilton: heritage permits

Get a free estimate

Tell us aboutthe lot.

Tell us about the lot, and whether the plans are drawn or still to come. You talk it through with the builder first.

  • Licensed builder

    Burlington, Ontario

  • 15+ years

    Building

  • 300+ houses

    Completed