Skip to content

Whole homes · 04 · More house, same lot

Home Additions in Mississauga

Home additions in Mississauga, as new rooms at the back or on a second storey, with electrical, plumbing and heating carried into them and every trade scheduled by the builder.

Licensed builder
WSIB
Years building
15+
Houses completed
300+
The back of an older brick house with a new single-storey addition in matching brick, glass doors opening onto a stone patio.

What’s included

What’s included
in an addition.

Rear and second-storey additions, and everything that joins the new rooms to the old ones: structure, roof, services and the outside.

  • A single-storey rear addition in vertical cedar with a wall of glass doors onto a limestone terrace, on an older brick house.

    Rear additions

    New footings carry the addition out into the yard. Setbacks and the lot’s remaining coverage set its size.

  • A brick bungalow getting a second storey, the new upper floor framed, sheathed and roofed over the old house.

    Second-storey additions

    Another floor goes on top of the house when the structure below, foundation and framing, is shown to carry it.

  • Where an addition meets an older house: the new framing butted to the old brick and the new roof tied into the existing one.

    Tied into the existing structure, roofline and systems

    The roof sheds water because the new work’s framing, roof and services join the old. Ducts, pipes and wiring then run on as one house.

  • An older two-storey clapboard house with a side addition matched to it in siding, windows, trim and roof.

    Exterior matched to the house

    Windows, siding, trim and roof are chosen to match the house. The new rooms then do not look tacked on afterward.

How it runs

The whole frame,
stage by stage.

Rooms and whole houses share five stages in an identical order, and one builder answers for each.

  1. 01

    Permits

    Every addition needs a building permit, some a zoning clearance, and a regulated lot Conservation Halton.

  2. 02

    Structure

    Work that goes out gets footings. Framing then joins the house and roofline.

  3. 03

    Trades

    One schedule coordinates the electrical, plumbing and HVAC run into the new rooms.

  4. 04

    Finishes

    The inside is finished, and the exterior picks up the house’s siding, trim and windows.

  5. 05

    Handover

    Once every stage and the final are inspected, you take over the new rooms.

Why Hanna Homes

Why one builder
for all of it.

Four matters get settled at the join, by the builder, before the framing goes in.

Before any new room is drawn, it is settled whether the old foundation and framing can bear the added load.

Where the new and old roofs meet, the inspector sees the framing before it is covered. The new roof runs over that seam to the old.

Trades, coordinated by the builder around the inspections, carry pipes, ducts and wiring on across to the addition from the old rooms.

Trim, siding, roof and windows follow what the house already has. The new rooms look like part of it, not something added later.

Client reviews

Their house,
their words.

01Additions

We needed more room but didn’t want to leave the street. The second storey went on over the summer, and from the sidewalk you’d think the house was always built that way.

Greg H.Burlington
02Whole home

We put off the whole house for years because we couldn’t picture living through it. Akram walked us through every stage before it started, and each week went the way he said it would.

Laura M.Oakville
03Kitchens

The crew covered the floors and cleaned up at the end of every day, which mattered with two kids at home. The new kitchen is the room everyone ends up in now. Worth every week of takeout.

Sanjay P.Burlington
04Custom homes

Building a new house was the biggest decision we’ve ever made, and it never felt rushed. We walked the site most Saturdays and always knew exactly where things stood.

Michelle R.Ancaster
05Basement apartments

We turned the basement into a unit for my mother-in-law. She has her own entrance and her own kitchen, and we still get Sunday dinners. The paperwork I was dreading turned out to be the part I thought about least.

Daniel K.Kitchener
06Bathrooms

One bathroom is a small job for a builder, but they treated it like the whole house. The tile lines up, the door finally closes properly, and they finished the week they said they would.

Ana T.Cambridge
07Knockdown & rebuild

Our old bungalow wasn’t worth saving, so we took it down and built new on the same lot. They kept the neighbours in the loop from demolition to the final walk-through. We love coming home to it.

Priya S.Oakville
08Basements

The basement used to be storage and a furnace. Now it’s a family room the kids actually want to be in. A clear quote, no surprises, and the site was swept every night.

Kevin L.Ancaster
09Whole home

We bought an older house knowing it needed everything. Akram was straight with us from the first visit about what was worth keeping. Every room is new to us now, and it still feels like the house we fell for.

Jessica W.Kitchener
10Kitchens

Third builder we spoke to, and the only one who returned every call. When we changed our minds about the island halfway through, they made it work without any drama.

Robert F.Cambridge

01 / 10

Projects

Selected work,
inside and out.

A new house, a bungalow, a bath, a basement and a kitchen are all finished: three rooms and two whole homes.

01Whole-Home Renovations

A bungalow, renewed in limewash.

Brick is limewashed, windows go floor to ceiling, cedar is under the eaves and an oak door faces a limestone forecourt.

01 / 05

Service area

Within an hour
of Burlington.

Common questions

Common questions
in Mississauga.

The size and the way the new rooms join the house set the price, and in Mississauga the lot adds to it. Drawings must be approved before any excavation or framing, a tree of 15 cm or more across needs a permit to remove, and an arborist report goes into the application when trees are affected. No figure is quoted before drawings exist.

Design and permit review come first. Mississauga lists an addition as permit work, so the drawings are approved before excavation or framing starts, and any tree or conservation step is cleared inside that stage. After approval the build runs foundation or structure, then roof, trades and finishes, and ends at the final inspection.

A building permit, because Mississauga names an addition to an existing building as work that needs one. Depending on the lot you may also need a tree permit, Credit Valley Conservation's permit near a creek, valley or the lakeshore, and heritage approval inside a heritage conservation district.

It can. Credit Valley Conservation may require its own permit to enlarge a building within its regulated area, which covers ground beside a watercourse, a floodplain, a valley slope, a wetland or the lakeshore. Its mapping is read before the drawings are finalised, and that review can come ahead of the city permit. A rear addition puts new ground into the check, while a second storey stays on the house's footprint.

Read the Heritage District Plan before anything is drawn. Those three villages are Mississauga's heritage conservation districts, and the plan tells an owner which alterations need heritage approval, which can be required before the building permit. An addition changes the outside of the house, so it is checked against the plan first. Outside the three districts that step does not apply, and the addition goes to drawings, the building permit and any tree or conservation permit.

Still have a question?

Get a free estimate

People also ask

Before you build,
people in Mississauga ask.

What people in Mississauga search before home additions, answered for the town.

  • Trees of 15 cm or more across, Credit Valley Conservation's mapping and any heritage district plan. Each can put a permit or a report in front of the building permit, and a quote that skips them will change once they are read.

  • The city requires arborist reports on all development and construction projects except for dead trees. For an addition that touches trees it is a consultant step that goes into the application package and adds lead time before permits.

  • No. Mississauga lists an addition to an existing building as permit work, so excavation and framing wait until the drawings are approved. Any tree, conservation or heritage step that applies is cleared in the same stretch.

Good to know

Good to know
about home additions in Mississauga.

What changes the work in Mississauga: the rules, the houses and the ground.

Home addition permits in Mississauga

Mississauga lists an addition to an existing building as work that needs a building permit, so an addition cannot start until the permit drawings are approved. Design and permit review come before any excavation or framing, so a Mississauga addition starts with drawings, not excavation.

On a lot near a creek, valley slope, floodplain, wetland or the lakeshore, Credit Valley Conservation may ask for a permit of its own when a building is enlarged. The property is read against CVC mapping before drawings are finalised, since conservation review can come before the municipal permit.

Source: City of Mississauga: when a building permit is required

House additions in Mississauga, and what joins to what

A rear addition builds out and a second-storey addition goes up. Either one is joined to the structure, roof and services the house already has, and the new rooms get the electrical, plumbing and HVAC they need, connected by the builder to what is there. The exterior is matched to the house.

In a heritage conservation district (Meadowvale Village, Old Port Credit Village or Streetsville), the Heritage District Plan says which alterations need heritage approval. Exterior changes and additions are then designed to that plan from the start.

Source: City of Mississauga: when heritage approval is required

Home addition cost and timing in Mississauga

Going out or going up, the condition of the walls and roof where the new rooms join the house, the services that have to reach them and the approvals all move the cost. Trees are an approval line of their own here, since the city asks for an arborist report on construction projects other than dead trees, and a lot with trees carries a consultant step.

The build cannot start until permit drawings are approved, and a tree, conservation or heritage step cleared along the way may push that approval back. Which of those approvals apply to your lot is what the schedule depends on.

Source: City of Mississauga: request to injure or remove trees

Drawing a Mississauga addition around its trees

The plans start with the lot. If the footprint of an addition would reach a mature tree, the tree permit is sorted before site work, because a tree 15 cm (6 inches) or more across cannot be injured or removed in Mississauga without one. Tree positions are therefore marked at the design stage, and a rear addition is drawn around them where it can be.

Then comes the choice between out and up, made against the lot and the house together. The builder works from those drawings once the city approves them.

Source: City of Mississauga: request to injure or remove trees

Get a free estimate

The roomyour house needs.

Tell us about the house and the room it is missing, and talk out or up through with the builder before plans are drawn.

  • Licensed builder

    Burlington, Ontario

  • 15+ years

    Building

  • 300+ houses

    Completed