Skip to content

Whole homes · 04 · More house, same lot

Home Additions in Milton

In Milton, home additions built out sit on new footings, and the framing is tied into the house and its roofline. One built up waits until the foundation and framing underneath are shown to carry another floor.

Licensed builder
WSIB
Years building
15+
Houses completed
300+
The back of an older brick house with a new single-storey addition in matching brick, glass doors opening onto a stone patio.

What’s included

What’s included
in an addition.

Rear or second-storey additions are covered, with all that ties new rooms into the existing house: the outside, services, roof and structure.

  • A single-storey rear addition in vertical cedar with a wall of glass doors onto a limestone terrace, on an older brick house.

    Rear additions

    A rear addition takes new footings in the yard. Setbacks and unused lot coverage limit its size.

  • A brick bungalow getting a second storey, the new upper floor framed, sheathed and roofed over the old house.

    Second-storey additions

    Building up over the house waits until the framing and foundation beneath are shown able to hold another floor.

  • Where an addition meets an older house: the new framing butted to the old brick and the new roof tied into the existing one.

    Tied into the existing structure, roofline and systems

    New roof, framing and services connect with the old. Wiring, ducts and pipes carry through as one house, and the roof sheds water.

  • An older two-storey clapboard house with a side addition matched to it in siding, windows, trim and roof.

    Exterior matched to the house

    Roof, windows, trim and siding match the house. That way the new rooms look like part of it, not an add-on.

How it runs

The whole frame,
stage by stage.

Whole houses and rooms alike follow the same order: five stages, each answered for by one builder.

  1. 01

    Permits

    A building permit always, a zoning clearance where needed, and Conservation Halton on a regulated lot.

  2. 02

    Structure

    Any extension gets footings first; framing connects with the house and roofline.

  3. 03

    Trades

    The new rooms get electrical, plumbing and HVAC carried into them, on one coordinated schedule.

  4. 04

    Finishes

    The inside is finished, and the exterior picks up the house’s siding, trim and windows.

  5. 05

    Handover

    Once every stage and the final are inspected, you take over the new rooms.

Why Hanna Homes

Why one builder
for all of it.

The builder has four items to settle at the join, ahead of framing the addition.

The existing foundation and framing are checked first, to see if they can take the added load. The drawings come after.

Across the seam, the new roof meets the old one. The join’s framing is left open for the inspector, and covered only after that.

From the existing rooms to the added ones, wiring, pipes and ducts keep running, and the builder coordinates each trade around inspections.

Roof, windows, trim and siding are matched to the house as it stands, which stops the new rooms reading as an add-on.

Client reviews

Their house,
their words.

01Additions

We needed more room but didn’t want to leave the street. The second storey went on over the summer, and from the sidewalk you’d think the house was always built that way.

Greg H.Burlington
02Whole home

We put off the whole house for years because we couldn’t picture living through it. Akram walked us through every stage before it started, and each week went the way he said it would.

Laura M.Oakville
03Kitchens

The crew covered the floors and cleaned up at the end of every day, which mattered with two kids at home. The new kitchen is the room everyone ends up in now. Worth every week of takeout.

Sanjay P.Burlington
04Custom homes

Building a new house was the biggest decision we’ve ever made, and it never felt rushed. We walked the site most Saturdays and always knew exactly where things stood.

Michelle R.Ancaster
05Basement apartments

We turned the basement into a unit for my mother-in-law. She has her own entrance and her own kitchen, and we still get Sunday dinners. The paperwork I was dreading turned out to be the part I thought about least.

Daniel K.Kitchener
06Bathrooms

One bathroom is a small job for a builder, but they treated it like the whole house. The tile lines up, the door finally closes properly, and they finished the week they said they would.

Ana T.Cambridge
07Knockdown & rebuild

Our old bungalow wasn’t worth saving, so we took it down and built new on the same lot. They kept the neighbours in the loop from demolition to the final walk-through. We love coming home to it.

Priya S.Oakville
08Basements

The basement used to be storage and a furnace. Now it’s a family room the kids actually want to be in. A clear quote, no surprises, and the site was swept every night.

Kevin L.Ancaster
09Whole home

We bought an older house knowing it needed everything. Akram was straight with us from the first visit about what was worth keeping. Every room is new to us now, and it still feels like the house we fell for.

Jessica W.Kitchener
10Kitchens

Third builder we spoke to, and the only one who returned every call. When we changed our minds about the island halfway through, they made it work without any drama.

Robert F.Cambridge

01 / 10

Projects

Selected work,
inside and out.

A new house, a bungalow, a bath, a basement and a kitchen are all finished: three rooms and two whole homes.

01Whole-Home Renovations

A bungalow, renewed in limewash.

Windows run floor to ceiling, brick is limewashed, with an oak door to a limestone forecourt and cedar under the eaves.

01 / 05

Service area

Within an hour
of Burlington.

Common questions

Common questions
in Milton.

Size comes first, then what the lot allows. Out or up, how the new rooms tie into the structure and systems already there, and the approvals all move the price. In Milton the approvals can include Conservation Halton, whose definition of development covers making a building bigger, and the Niagara Escarpment Commission. No figure is quoted before the drawings exist.

Drawings and approvals come first, and they are where a Milton addition stretches. A designated heritage house waits on its heritage permit, and a lot touching a Conservation Halton regulated area waits on that permit, which the authority has up to 90 days to issue. After the permits, the build runs from foundation to final inspection.

Yes, a building permit, and no addition starts without one. Depending on the lot, a Conservation Halton permit, a Niagara Escarpment Commission permit or a heritage permit may be needed too, and each is checked before the drawings are finalised. Hanna Homes runs them alongside the building permit.

Often, yes. Where the new rooms open into the house, a load-bearing wall can come out and a beam sized for what it carried goes in, under the building permit. First comes the question of which walls carry load and how the new roof meets the old one. On a designated heritage house, the heritage permit for the addition comes before this work.

Matching the exterior is part of the job, so the new rooms read as part of the house rather than as an add-on. On a designated heritage property in Milton, adding to the building needs a heritage permit, which means the look of the outside is settled before building permit work begins.

Still have a question?

Get a free estimate

People also ask

Before you build,
people in Milton ask.

What people in Milton search before home additions, answered for the town.

  • Yes. A designated heritage property needs a heritage permit under the Ontario Heritage Act before an addition, and that review comes ahead of the building permit work. The same lot check covers Conservation Halton and the Escarpment.

  • A per-square-foot rate hides what drives an addition. Whether it goes out or up, how it joins the structure and systems already there, and which approvals the lot needs all matter more. Prices come from drawings, not from a rate.

  • The exemption holds only if all additions to the original dwelling, the new one included, total 93 square metres or less, with further conditions on height and setbacks. Past that, a Niagara Escarpment Commission permit is needed.

Good to know

Good to know
about home additions in Milton.

What changes the work in Milton: the rules, the houses and the ground.

Home addition permits in Milton

Increasing the size of a building is one of the things Conservation Halton counts as development, along with grading the site. On a lot touching a flood plain, valley land, wetland, watercourse or steep slope, an addition needs its permit as well as the building permit, so the site check and the drawings start earlier.

On Niagara Escarpment Plan lands, an addition to a single dwelling is exempt from an NEC permit only if the total of all additions is 93 square metres or less, with further conditions on height and setbacks. Those are measured against the design before it is fixed.

Source: Conservation Halton: permitting

House additions in Milton and what they take in

A rear addition builds out at the back and a second-storey addition goes up. Both are joined to the structure, roof and services the house already has, and the outside is matched to the house. The builder connects electrical, plumbing and HVAC for the new rooms to what is there.

Milton requires a heritage permit to alter a designated heritage property, and adding to a building is one of the alterations it names, along with replacing windows or doors. On such a house the heritage review waits ahead of the building permit work.

Source: Town of Milton: altering a heritage property

Home addition cost and timing in Milton

Whether the addition goes out or up, what shape the structure is in where the new rooms join it, which services have to extend and which approvals the lot needs are what move the cost. Prices come from drawings, which is why the lot checks come first.

Conservation Halton's legislated timeframe to issue a permit is 90 days, and on a regulated lot that review can run alongside the building permit review or beyond it. The practical result is that a start date is set after the permits are in hand.

Source: Conservation Halton: permitting

Out or up on a Milton lot: setbacks and the house below

A rear addition needs room behind the house inside the setbacks. A second storey adds rooms without taking more of the yard, but the house below has to carry it, so its structure is checked first. Which one suits depends on the lot and on what the existing walls and foundation can bear.

Get a free estimate

The roomyour house needs.

Tell us about the house and the room it is missing, and talk out or up through with the builder before plans are drawn.

  • Licensed builder

    Burlington, Ontario

  • 15+ years

    Building

  • 300+ houses

    Completed