The crew covered the floors and cleaned up at the end of every day, which mattered with two kids at home. The new kitchen is the room everyone ends up in now. Worth every week of takeout.
Rooms · 05 · The kitchen, rebuilt
Kitchen Renovations in Milton
Kitchen renovations in Milton can open up a wall and reshape the room. The sink, range and fridge are placed first, and the plumbing, electrical and gas are planned from where they sit.
- Licensed builder
- WSIB
- Years building
- 15+
- Houses completed
- 300+

What’s included
What goes into
a kitchen renovation.
Layout and walls are done first. After that, each piece is measured from the one that went in before it.

Layout changes and opening up walls
Walls can be opened up, and the room’s shape can change. The fridge, range and sink are given their positions here.

Cabinetry and millwork
Millwork and cabinets are made for the new layout instead of the old, and the templates for the counters are taken from them.

Counters and backsplash
The counter template is taken from the installed cabinets. The backsplash comes last, set to the finished counters.

Flooring and lighting
Flooring is installed alongside the finishes. Lights and outlets are positioned with the layout, ahead of any wiring inspection.

Plumbing, electrical and gas, coordinated
One room holds the three trades, scheduled by the builder. Nothing closes the walls until both inspections pass, plumbing and electrical.
How it runs
One bay of it,
stage by stage.
Rooms and whole houses share five stages in an identical order, and one builder answers for each.
- 01
Permits
A wall or sink that moves means filing the application and drawings first.
- 02
Structure
Walls come out or move, and the layout is set before any trade arrives.
- 03
Trades
Behind open walls, gas, plumbing and electrical are roughed in. Inspections come before drywall.
- 04
Finishes
Last comes the backsplash, after counters templated from the installed cabinets.
- 05
Handover
With a permit, the job ends at a final inspection, then the kitchen is yours.
Why Hanna Homes
Why one builder
for all of it.
A kitchen puts three trades in one room and measures each finish off the one before, so the builder’s order of work matters.
Demolition waits until the walls and the range, sink and fridge positions are settled. All the work after takes its measurements from the layout.
When a range moves, its hood duct, gas line and circuit move too, so that wall’s drawing shows all three from the start.
Fit is built up one piece at a time: the installed cabinets give the counter template, and the finished counters give the backsplash its cut.
Appliance, outlet and light positions go on paper first. A change of mind later then does not mean tearing out inspected wiring.
Start with a call.
Client reviews
Their house,
their words.
Whole homes and single rooms, in the words of the people who live in them.
Third builder we spoke to, and the only one who returned every call. When we changed our minds about the island halfway through, they made it work without any drama.
We put off the whole house for years because we couldn’t picture living through it. Akram walked us through every stage before it started, and each week went the way he said it would.
Building a new house was the biggest decision we’ve ever made, and it never felt rushed. We walked the site most Saturdays and always knew exactly where things stood.
We turned the basement into a unit for my mother-in-law. She has her own entrance and her own kitchen, and we still get Sunday dinners. The paperwork I was dreading turned out to be the part I thought about least.
We needed more room but didn’t want to leave the street. The second storey went on over the summer, and from the sidewalk you’d think the house was always built that way.
One bathroom is a small job for a builder, but they treated it like the whole house. The tile lines up, the door finally closes properly, and they finished the week they said they would.
Our old bungalow wasn’t worth saving, so we took it down and built new on the same lot. They kept the neighbours in the loop from demolition to the final walk-through. We love coming home to it.
The basement used to be storage and a furnace. Now it’s a family room the kids actually want to be in. A clear quote, no surprises, and the site was swept every night.
We bought an older house knowing it needed everything. Akram was straight with us from the first visit about what was worth keeping. Every room is new to us now, and it still feels like the house we fell for.
01 / 10
Projects
Selected work,
inside and out.
A new house, a bungalow, a bath, a basement and a kitchen are all finished: three rooms and two whole homes.

01Kitchen Renovations
Kitchen and dining, one room.
Linen cabinets to the ceiling, a white oak island with a limestone top, and the table under a wide window.
01 / 05
Gallery
From the street
to the basement.
Tapping a picture shows it whole. Each service is here, from street to basement.Whole-home street views lead, with kitchens, bathrooms and basements after. Any picture opens to show it whole.
Seen one
Get a free estimate
you like?
13 pictures: Whole homes · Kitchens · Bathrooms · Basements
Service area
Within an hour
of Burlington.
Towns we build in
- 01BurlingtonHaltonHome base
- 02HamiltonHamiltonby Hwy 403, 15 min, 18 km by road, approximately
- 03OakvilleHaltonby the QEW, 20 min, 24 km by road, approximately
- 04AncasterHamiltonby Hwy 403, 25 min, 28 km by road, approximately
- 05MiltonHaltonby Hwy 407, 30 min, 30 km by road, approximately
- 06MississaugaPeelby Hwy 407 and Hwy 403, 30 min, 41 km by road, approximately
- 07CambridgeWaterloo Regionby Hwy 8 and Hwy 5, 45 min, 51 km by road, approximately
- 08KitchenerWaterloo Regionby Hwy 6 and Hwy 401, 55 min, 72 km by road, approximately
And anywhere else inside the line.
Common questions
Common questions
in Milton.
What Milton homeowners ask about kitchen renovations: what it costs, how long it takes and what the city asks for.
The layout moves the price most. A kitchen that keeps its walls and its sink in place is a smaller job than one opened to the next room, because a moved wall brings structure, a moved sink brings plumbing, and either can bring a permit. Cabinetry, counters and lighting come after that. A figure means something only once the layout is settled.
Three things stretch a kitchen more than the installing does: a layout change that needs a permit, cabinetry built to the new layout that cannot be ordered until the layout is final, and counters that are templated only once the cabinets are in. Each step is measured off the one before it, so an early delay passes down the line.
Moving a wall, altering structure or relocating plumbing brings a permit, and new cabinets and counters in the same layout usually do not. The Town of Milton's building department decides what a particular kitchen needs, so the sink and any wall you want moved are worth raising before the plan is drawn. Hanna Homes takes the application through.
The builder coordinates all three. Hanna Homes schedules the plumbing for the sink and dishwasher, the electrical for lighting and appliances, and the gas for the range before the walls are closed, so the trades meet in the room on one plan rather than leaving you to book each.
It begins with a call: you say where the house is and what you have in mind, and the layout is gone over with the builder before anything is bought. Hanna Homes is based in Burlington, 30 minutes from Milton. The layout comes first because the plumbing, electrical and gas all follow where the sink, range and fridge end up.
Still have a question?
Get a free estimatePeople also ask
Before you build,
people in Milton ask.
What people in Milton search before kitchen renovations, answered for the town.
Ask whether the layout is settled, whether a permit is needed for whatever moves, and who coordinates the plumbing, electrical and gas. A kitchen should not be taken out while any of those is open, because the new plan decides what comes out.
Ask who answers for the whole room, not only the carpentry, and who applies for the permit if one is needed. Then ask in what order the cabinetry, counters and backsplash go in, since each is measured off the one before.
Very. The layout can change, walls included, and the cabinetry and millwork are built to the new layout. The countertop is measured once the cabinets are set, and the backsplash is cut to the countertop, so each piece fits what is already in.
Good to know
Good to know
about kitchen renovations in Milton.
What changes the work in Milton: the rules, the houses and the ground.
Kitchen renovation permits in Milton
A kitchen that gets new cabinets and counters in its existing layout seldom needs a permit. One that moves a wall, alters structure or relocates plumbing does, and in Milton the application goes to the Town's building department, which decides what a given kitchen needs. Hanna Homes handles the paperwork. The useful thing to settle early is whether the sink or any wall is moving, since that is what turns a cabinet job into a permit job.
Kitchen remodel in Milton, from layout to lighting
A remodel here means the room rebuilt, not refreshed. Walls can open to the dining or living room, the cabinetry and millwork are built to the new layout, counters and backsplash follow, and flooring and lighting finish the room.
Plumbing, electrical and gas sit behind all of it. The builder schedules the three trades before the walls close, which lets the kitchen come out as one piece of work and not three separate jobs.
Kitchen renovation cost and timing in Milton
Four things move the cost: how far the layout and walls change, whether plumbing has to be relocated, the cabinetry, and the counters. The first two are decided before anything is bought, which is why they are settled first and a number comes after them.
The sequence also sets the timing. Cabinetry waits on the layout, counters wait on the cabinets, and the backsplash waits on the counters. A permit, where one applies, sits in front of all of that.
Home remodeling for kitchens in Milton starts with the plan
Moving a wall or the sink changes more than the drawing. It changes where the pipes and wiring run, what the permit asks for and the order the trades arrive in, so the layout is fixed before the cabinetry is ordered. Leaving the sink where it is and changing everything around it is a legitimate way to renovate, and it keeps the plumbing out of the schedule.
Get a free estimate
Start with thekitchen layout.
Tell us what you have now and where the sink, range and fridge should end up, and talk it through with the builder first.
Licensed builder
Burlington, Ontario
15+ years
Building
300+ houses
Completed






