Basement finishing cost: what you decide versus what you find

Basement finishing cost is set by two lists: what you decide the room will hold, such as a bedroom or a bathroom, and what the basement turns out to have, such as damp walls or a low ceiling under the ducts.

Published
Reading time
6 min read
Written by
Hanna Homes Construction
Finished basement with a dark wet bar under a drywalled bulkhead, oak shelves, a sofa, a light oak floor and a large window

What decides the cost of finishing a basement

Basement finishing cost starts with what the room will hold. A bedroom puts an egress window on the permit drawings, and a bathroom puts new plumbing fixtures there (Source: Burlington Basement Finish checklist). Then the basement adds its own terms: water to stop before anything is framed, and a ceiling that may sit low under the beams and ducts.

That splits what drives the cost into two groups. Size, layout, finishes and plumbing are the ones you pick. Water, ceiling height and whatever hangs below the joists are the ones you find, and they get dealt with first.

The City of Burlington lists finishing a basement among the home projects that may need permits and clearances (Source: City of Burlington). So the paperwork is part of the cost from the start, and some of it comes due before anything is built.

Average basement renovation cost per square foot: what it leaves out

An average basement renovation cost per square foot spreads a bathroom, a bedroom window and the drawings evenly across the whole floor, so it fits almost no real basement. That is why this guide gives none.

Picture two basements. One is a big open room with no bedroom and no bathroom. The other is smaller and has both, so its drawings carry an egress window and new plumbing fixtures (Source: Burlington Basement Finish checklist). Divide each job by its floor area and the smaller basement looks far dearer per square foot, even if both were priced fairly.

Treat any overall range or cost per square foot you find online as a rough starting point, then price the rooms. The permit drawings already record each room's size, use and ceiling height (Source: Burlington Basement Finish checklist), and that is a better base for a price than an average.

What does a full basement renovation cost next to a basic finish?

A full basement renovation costs more than a basic finish because each step up adds work that has to be drawn, built and inspected. The cost tiers follow scope, by what each one adds:

  • A basic finish frames and insulates the walls, closes them in, then adds flooring and lighting. Even at this tier the drawings show framing size and spacing, the insulation type and its thermal value, the vapour barrier and the interior finish.
  • A mid-range finish adds a bathroom. The drawings then show the existing and the proposed plumbing fixtures.
  • A bedroom adds an egress window, located and sized on the plan, and a lintel size where the opening is new or enlarged.
  • A suite-level job, such as a legal suite or an in-law conversion, is the higher-cost scope because it is a second unit, with its own permit path and code items an ordinary finish does not carry.

The first three come from Burlington's checklist for a basement finish, which is marked as not for an additional dwelling unit (Source: Burlington Basement Finish checklist). A second unit follows Ontario's second-unit rules instead. A basement second unit may have a ceiling height of 1.95 m over the entire required floor area, and the Building Code requires a 30-minute fire separation between units, and between units and common areas (Source: Government of Ontario).

Choices you control, conditions the basement sets

Before anyone prices the job, split it into two columns: what you can change, and what the basement has already decided.

Decisions you make:

  • Bedroom or den. A bedroom brings the egress window onto the drawings (Source: Burlington Basement Finish checklist).
  • Bathroom or no bathroom, and where it sits relative to the plumbing already there.
  • Moving existing plumbing, or working around it.
  • Ceiling work. A dropped ceiling over ductwork, a thicker floor build-up and a bulkhead around a beam all spend height.

Conditions the basement sets:

  • Water and moisture. Damp and leaks get traced and fixed before any wall goes against the foundation.
  • Ceiling height, measured at its lowest points under the beams and ducts and recorded for every room on the drawings.
  • Ducts and beams below the joists, which decide where a bulkhead has to go.
  • The existing window. If a bedroom needs a new or larger opening, that is structural work, with a new lintel sized on the plan.

Water control comes before finishing because the new wall goes up against the foundation in the layers the checklist asks for: framing, insulation, vapour barrier and interior finish (Source: Burlington Basement Finish checklist). Drywall and flooring hide a leak without stopping it.

For budgeting, price the first column from the drawings and hold a contingency for the second until the basement has been opened and measured. A sump pump or a floor drain, height work around beams and ducts, and old finishes that have to come out can all move the cost before a single wall is framed.

The ways to reduce cost sit almost entirely in the first column. Keep a new bathroom close to the existing plumbing, and if a room can work as a den, leave it a den.

What the permit drawings for a finished basement must show

In Burlington, a Pre-Building Approval application comes before the building permit application (Source: City of Burlington). That review checks the project against the zoning by-law, the grading and drainage clearance by-law, and the public and private tree by-laws (Source: City of Burlington).

The permit application then follows the City's basement finish checklist. Its drawings show (Source: Burlington Basement Finish checklist):

  • every room's ceiling height, dimensions, door sizes and use
  • the location of each smoke alarm and carbon monoxide alarm
  • existing and proposed walls, with framing size and spacing, insulation type and thermal value, vapour barrier and interior finish
  • existing and proposed plumbing fixtures
  • the egress window's location and size if there is a bedroom, with a lintel size for a new or enlarged opening
  • existing and proposed supply, return and exhaust air openings
  • a three-way switch at the head and foot of the stairs that controls a light
  • schedules giving the designer's qualifications and BCIN numbers

The last item means whoever draws the plans is named on them, along with their qualifications.

Once the permit is issued, you receive a checklist of the inspections the job needs and book them with the building inspector (Source: City of Burlington). The City also asks that work not be covered or continued until each inspection stage has been reviewed, so every inspection is a pause written into the schedule.

Why the drywall waits for the electrical inspection

Electrical, plumbing and HVAC work all runs inside the new walls, and the wiring sets the pace. A building permit is not the same as filing an electrical notification with ESA (Source: ESA), and even a small electrical job needs a notification of work filed before the work begins (Source: ESA).

ESA then inspects the installation before it is concealed (Source: ESA). Until that inspection is done, no insulation or drywall goes over the wiring.

The pipes and the air are settled earlier, on paper. The plumbing fixtures are already on the drawings, and so are the supply, return and exhaust air openings (Source: Burlington Basement Finish checklist). A duct that has to drop below the ceiling is planned at framing, not discovered once the walls are up.

Water, drawings, framing: the order Hanna Homes follows

Hanna Homes runs a basement in a set order, and water comes first: nothing is framed or floored over a damp wall or a leak until its source has been traced. The permit drawings are filed before framing or any plumbing starts.

Framing goes up with the bedroom window already sized to code and any duct drop already planned. Wiring and plumbing go into open walls, and ESA authorizes the wiring before anything covers it. Hanna Homes coordinates the electrician, the plumber and any heating work on one schedule.

Insulation and drywall follow once the inspection stage is reviewed, then flooring and lighting. The last inspections are signed off and the basement is handed over.

How long a basement finish takes depends on those holds and on what the basement shows. Damp and ceiling height set the schedule because both turn up when the basement is measured, so we promise no duration until we have seen it. Send us the basement as it is now and what the room should hold, and we start with the ceiling height, the window and the permit.

Basement renovations in Burlington

Keep reading

More to read
before you build.

  • CostsKitchen Renovations

    Kitchen renovation cost: what moves, and what stays put

    Where the sink and range end up sets most of a kitchen renovation cost. Keep them in place and the work can stay off the permit list; move them and new plumbing, gas, wiring and paperwork come along.

    9 min read

  • CostsHome Additions

    Cost of a home addition: from zoning clearance to roofline

    The cost of a home addition begins with drawings and Burlington's approvals, before any digging. Building out or up then decides what carries the new rooms, and the join to the existing house sets the rest.

    7 min read

Get a free estimate

Your houseis next.

Tell us what you have in mind, and talk it through with the builder first.

  • Licensed builder

    Burlington, Ontario

  • 15+ years

    Building

  • 300+ houses

    Completed